I-66 Message Sent to I-66 Parallel Trail Supporters
Kudos to all the supporters who spoke up to make biking and walking an integral part of the I-66 Outside the Beltway improvements. You certainly made an impact. In its revised Tier II Environmental Assessment, the Virginia Department of Transportation stated that,“Based on substantial public interest a corridor-wide bikeway and pedestrian plan was developed.”
![]() |
| Click on image to view map |
Comments can be submitted until February 4th (Deadline was extended to Feb. 9). Please direct them to Ms. Susan Shaw, PE, by email to Transform66@VDOT.Virginia.gov, via the online comment form on the project's website, or join the discussion. Reference "I-66 Tier 2 Revised EA" in the subject line.
According to the revised EA, the I-66 project will include a major regional trail along the I-66 corridor outside the beltway (click on image to see map) as well as new bicycle and pedestrian facilities on all rebuilt bridges. The report states that including these improvements will increase access to public transportation, travel choices, connectivity and safety throughout the I-66 corridor.
Specific design requirements for the bicycle infrastructure was also recently released as part of the I-66 Request for Proposals, which included the draft Technical Requirements.
Here are some key things you should know from these documents:
- The regional trail will be a combination of a parallel trail constructed within the I-66 right-of-way as part of the project, and improvements to adjacent roads and trails that will be built separately in coordination with local jurisdictions.
- Bike and pedestrian improvements at I-66 crossings are included where bridges are being reconstructed.
- All new facilities crossing I-66 or associated ramps shall be grade-separated unless otherwise approved by VDOT.
- Where proposed noise barriers are to be located near homes, the parallel trail will be on the I-66 side of the noise barrier.
- There are 13 access points proposed for the parallel trail, along with the suggestion that access generally be at half-mile increments.
- Park-and-ride facilities will include bike and pedestrian connections to nearby facilities, and covered bike racks for a minimum of 75 bicycles.
- Mile marker and wayfinding signs shall be incorporated in the design.
- Existing trails impacted by the project shall be replaced.
Thank you for your support,
Sonya Breehey
FABB Board Member
Labels: i-66, I-66 multimodal study
VDOT Releases Latest I-66 Environmental Assessment Docs
![]() |
| I-66 Trail at Route 123 |
See the Fairfax County portion of the Parallel Trail map. The trail would extend the Custis Trail located inside the Beltway. See the FABB I-66 Info Page for other supporting documents.
The Federal Highway Administration requires the preparation of an EA when VDOT conducts a significant project like the expansion of the I-66 corridor. According to the document, "This Tier 2 Revised EA is being made available for a 15-day public review and comment period. All comments received on the Tier 2 Revised EA will be considered and substantive comments will be addressed prior to finalizing the Tier 2 EA process and prior to a Tier 2 NEPA decision by FHWA." Comments are due February 4.
From VDOT: "Submit your written comments on the Tier 2 Revised EA by February 4, 2016 to Ms. Susan Shaw, PE, by email to Transform66@VDOT.Virginia.gov or via the online comment form on the project's website or join the discussion. Please reference "I-66 Tier 2 Revised EA" in the subject line for all correspondence."
Earlier VDOT released the Requests for Proposals that included Technical Requirements which contained proposed locations where the parallel trail can be accessed from adjacent neighborhoods. We will post our analysis of those points soon.
From the report:
The bicycle and pedestrian accommodation recommendations would support the overall purpose and need of the project, seeking to achieve the following objectives:
- Increase access to public transportation
- Increase travel choices
- Increase bicycle and pedestrian connectivity for communities within the I-66 corridor
- Accommodate safe and efficient bicycle and pedestrian travel within the I-66 corridor
- Integrate existing and planned bicycle and pedestrian networks in communities along the I-66
- corridor
Accommodating bicycles strategically along and crossing the I-66 corridor could provide substantial benefits to the transportation system, benefits to the environment, and improvement to people’s quality of life. Bicycling is a healthy, efficient, and affordable transportation alternative. It can dramatically enhance people’s access to transit and related facilities, connect neighboring communities, improve people’s health, and reduce people’s reliance on a personal automobile for short and moderate-distance trips.
Fairfax County and Prince William County have invested substantially in bicycling infrastructure, and along with transportation-related associations, the counties have also invested in programs to encourage and expand bicycling. Currently, I-66 is a barrier to bicycle network connectivity in many locations outside the Beltway (I-495). The modification of bridges, ramp termini, the freeway mainline, and some local roadways offers the opportunity for bicycling networks along the corridor (existing and planned) to become better connected.
Labels: custis trail, i-66, I-66 multimodal study
I-66 Meeting on Tues. Dec 8 - Support the Parallel Trail
FABB has been advocating for construction of a trail parallel to I-66 outside the Beltway as part of the proposed widening project. The trail is included on the county Comprehensive Plan and has the support of the Board of Supervisors. With help from cyclists who have contacted VDOT, the trail is now included in the plans, but we are going to have to continue to speak out in support of this trail.On December 8 you will have an opportunity to speak to the Commonwealth Transportation Board (CTB) to support plans for extension of the Custis Trail I-66 outside the Beltway. The meeting will be held at George Mason High School, 7124 Leesburg Pike, Falls Church from 6-8 pm. Cyclists are encouraged to attend the meeting and sign up to speak in favor of the proposed parallel trail and bike facilities on the rebuilt bridges.
Labels: custis trail, I-66 multimodal study
CTB Public Meeting on I-66 on Dec. 8
On December 8 the public will have an opportunity to speak to the Commonwealth Transportation Board (CTB) about plans for changes to I-66 inside and outside the Beltway. The meeting will be held at George Mason High School, 7124 Leesburg Pike, Falls Church from 6-8 pm. Cyclists are encouraged to attend the meeting and sign up to speak in favor of the proposed parallel trail and bike facilities on the rebuilt bridges. The parallel trail would be an extension of the very popular Custis Trail inside the Beltway.Labels: custis trail, i-66, I-66 multimodal study
Nov-Dec 2015 FABB Newsletter
On October 27, the Virginia Commonwealth Transportation Board approved the latest plans for the widening of I-66 Outside the Beltway. The plans include the parallel trail that will serve as an extension of the very popular Custis Trail, which is located inside the Beltway. The rebuilt bridges also will include new ped/bike facilities. We are very encouraged that the parallel trail is now included as an integral part of the project and that most of the ramp crossings are grade-separated using either bridges or tunnels.
Fairfax County recently named Adam Lind as the new Bicycle Program Manager, commonly referred to as the Bike Coordinator. Adam has been serving as the acting Bike Coordinator since Charlie Strunk retired in January of this year. Congratulations Adam!
Last week Fairfax County presented the latest plans for the Soapstone Connector, which will extend Soapstone Drive from Sunrise Valley Drive to Sunset Hills Road across the Dulles Toll Road. With limited crossings of the Toll Road, intersections around the Reston Parkway and Wiehle Ave. crossings become very congested during rush hour, making them especially dangerous for pedestrians and bicyclists. The Soapstone Connector will provide a new way for cyclists and pedestrians to safely cross the Toll Road and access the Wiehle-Reston East Metrorail station and other destinations on both sides of the Toll Road. Bike lanes are included in the project and serve as an extension of the current bike lanes on Soapstone Dr.Vienna Metrorail Bicycle Access Improvements: $400,000[Application postponed until after planned Vienna Metrorail construction is completed.]- Cinder Bed Bikeway: $400,000
- Van Dorn Street Bicycle and Pedestrian Improvements: $400,000
- Reston Bike Share Capital Equipment: $400,000 (See FABB blog for details of recent Reston bikeshare meeting.)
Using Safe Routes to School grant funds, Fairfax County Public Schools (FCPS) has purchased 30 bikes and 6 Strider bikes for bicycle safety lessons at elementary schools. Week-long lessons were conducted at 12 elementary schools last spring for grades 4, 5, and 6, reaching over 8,000 students. Students at several more schools received lessons this fall. Additional grant funds will be used to purchase more bikes to expand the bike program to middle schools. Lessons include bike skills, safety education, signaling, and road simulation riding.- November 18, Wednesday - FABB Monthly Meeting in Vienna at 7:30 p.m.
- December 16, Wednesday - FABB Monthly Meeting at Mosaic District at 7:30 p.m.
- December 19, Saturday - Tour de Lights in Reston, 4:30-6 p.m.
Labels: adam lind, candidate survey, fabb newsletter, i-66, I-66 multimodal study, rackspotter, safe routes to school, soapstone connector, soapstone drive, transportation alternatives, wakefield park
GGW article on I-66 parallel trail
![]() |
| I-66 parallel trail in green along N side at Nutley St. |
Building out the entire thing would make the Custis Trail one of the longest trails in the region. It'd be up there with the W&OD Trail's 45 mile long path, and it'd dwarf other well know trails in the area like the Mount Vernon Trail (18 miles) or the Capital Crescent Trail (11 miles). You'd be able to take the trail all the way from the Key Bridge to Manassas Battlefield National Park and beyond.
Working new trails in with road plans is a way to make sure that even highway expansions are, in their own way, bike and walking-friendly. For such efforts to be successful, though, trails have to both get built and is adequate for people's needs. Otherwise the trail just gets seen as a simple amenity rather than a necessary part of the area's transportation infrastructure.
VDOT is holding meetings in Fairfax on Oct. 19 & 20. These meetings are a great opportunity for area cyclists to voice their support for this new trail. Just because the trail is shown on plans does not mean it will be built. Your support is critical.
Monday, October 19, 2015Oakton High School
2900 Sutton Road, Vienna, VA 22181
Tuesday, October 20, 2015VDOT Northern Virginia District Office
4975 Alliance Drive, Fairfax, VA 22030
Labels: custis trail, greater greater washington, i-66, I-66 multimodal study
I-66 Outside the Beltway detailed plans now available
![]() |
| I-66 at Nutley St, parallel trail shown as solid green line |
Also shown on the drawings are the bike facilities across the bridges that will be rebuilt as part of the project. In the Nutley/I-66 drawing on the right you can see "Proposed Shared Use Paths" as solid green lines. The parallel trail is on the north side weaving through the interchange with bridges or tunnels crossing the ramps. The dashed green line in the upper left is the "Proposed Shared Use Path (By Others)," which in this case would be a section of the parallel trail built by Fairfax County.
There's a great deal of information in a large number of drawings. These will be printed and placed in sequence at the public information meetings planned later this month. Cyclists are encouraged to attend these meetings and learn more about the proposed bike facilities and support VDOT's trail proposal. Even if you don't support the expansion of I-66, if the project is built, we strongly support the trail proposals.
I-66 Outside the Beltway meetings held between 6:30 and 8:30 (as per comment below):
Oakton High School
2900 Sutton Road, Vienna, VA 22181
Tuesday, October 20, 2015VDOT Northern Virginia District Office
4975 Alliance Drive, Fairfax, VA 22030
Labels: custis trail, I-66 multimodal study, vdot
I-66 Preferred Alternative Includes Parallel Multi-use Trail
Today VDOT released their preferred option for the I-66 Outside the Beltway widening project, called the Preferred Alternative. According a video describing the Preferred Alternative design, the parallel trail is included, either inside the right-of-way or on local streets. Bike and ped facilities are also planned on the rebuilt bridges across I-66.The image above shows in blue where the trail is located inside the right-of-way, and in yellow on local streets. Two major sections in Fairfax County are located on local streets, between Nutley Street and Blake Lane and between Route 50 and the Fairfax Co Parkway. Major changes will likely be needed to make those local roads bike-friendly.
Inside the I-66 right-of-way (east to west): Gallows Road to Nutley Street, Blake Lane to Route 50, Fairfax Co Parkway to Route 29.
Local streets (east to west): Nutley Street to Blake Lane (either Virginia Center Blvd/Country Creek Rd on the north or Saintsbury Dr on the south), Route 50 to Fairfax Co Parkway (possibly Random Hills Rd to Monument Dr to Fair Lakes Parkway), and Route 29 to Haymarket.
It's critical that cyclists attend upcoming meetings to learn more about the plans and to support a safe, connected parallel trail:
Monday, October 19, 2015
Oakton High School
2900 Sutton Road, Vienna, VA 22181
Tuesday, October 20, 2015
VDOT Northern Virginia District Office
4975 Alliance Drive, Fairfax, VA 22030
From the Preferred Alternative Video:
Labels: i-66, I-66 multimodal study
FABB meeting on Wednesday in Vienna
Everyone is invited to attend the next FABB meeting on Wednesday, July 15 starting at 7:30 p.m. at Patrick Henry Library in downtown Vienna. We'll get a report on the latest county bicycle news from acting bike coordinator Adam Lind. We'll also discuss the upcoming Clips Beer & Film Tour event in Reston on September 10 and the latest information on bicycle facilities as part of the I-66 Outside the Beltway project. On Thursday some FABB members plan to meet with Chairman Bulova and transportation staff to discuss the best alternatives for building the I-66 parallel trail.Labels: clips beer and film, FABB meeting, i-66, I-66 multimodal study
Fairfax Times article on proposed I-66 trail
| FABB riders on the Custis Trail |
However, for residents in Dunn Loring and Oakton already concerned about the highway encroaching into their yards and a community school, one proposed bike trail signifies to them another 10 feet of property that they might lose.
“There is simply no physical way to fit a bike lane in the I-66 corridor, at least through Vienna. Simply adding extra travel lanes is stressful enough,” Sen. Chap Petersen (D-Dist. 34) wrote on his Ox Road South blog, expressing the concerns of his constituents. “There’s no point in reducing the right of way take for new lanes, if you’re simply going to take it for a bike path.”
We were also quoted in the article:
For example, this includes adding bike and pedestrian facilities to bridges across I-66 that would be replaced due to the road widening. A similar effort was made when the 495 Express Lanes were being constructed.
“This is a great opportunity to provide safe, convenient bike and pedestrian access,” Wright said.
The biggest point of contention is a potential major trail that runs parallel to I-66, like the Custis Trail in Arlington County, which connects the Washington & Old Dominion Trail to the Key Bridge in Rosslyn.
Wright said the high number of both commuters and recreational users of the W&OD and the Custis Trail show that there is great demand for these types of major trails.
“What we really need are better first-class trails for everyone,” he said.
Labels: i-66, I-66 multimodal study, Sen. Chap Peterson
FABB's I-66 Public Hearing Comments
Over 20 citizens spoke last night at the first public hearing on the I-66 Outside the Beltway project. Almost all speakers voiced support for transit over widening the road. Several speakers said they moved to the Dunn Loring area to be in a walkable/bikeable neighborhood that would be negatively impacted by the project. FABB's Sonya Breehey spoke on behalf of FABB in support of the extension of the Custis Trail parallel to I-66 and bike/ped facilities on the rebuilt bridges.You can support this effort by telling VDOT to include the parallel trail as part of the project. Attend the second public hearing tonight at Oakton High School, 2900 Sutton Road, Vienna, VA 22181, from 5:30-9:00. See the FABB Blog and FABB I-66 Info Page for more info. Written comments may be submitted through June 18th by email to Transform66@VDOT.Virginia.gov. Your comments do make a difference.
Below are FABB's public hearing comments:
I truly appreciate the incorporation of bicycle and pedestrian facilities for reconstructed bridges. These connections are imperative to ensuring this massive highway project does not sever neighborhoods, and that our bridges remain a humane place for residents to walk and bike transit, schools, or anywhere they need to go.
I am concerned however that while the Tier II Environmental Impact Statement indicates VDOT has studied the feasibility of a parallel bicycle facility; the trail still has not been included in the project.
An I-66 parallel trail would provide significant connectivity to the northern Virginia transportation trail network. A recent study showed that 25% of Fairfax County residents live within a mile of I-66 or within 1/2 mile of either the Fairfax Co Parkway or W&OD Trails, both of which would be connected by an I-66 parallel trail.
In fact, over 500 county residents provided comment to VDOT asking that a parallel trail be part of your multi-modal solutions.
They know, as do I, that a parallel trail along I-66 could provide direct access for biking and walking from neighborhoods to:
- Current and future public transit, and park and ride lots;
- Suburban centers like Merrifield, Fairfax Corner and Fair Oaks; and
- Employment centers throughout central Fairfax County.
While the EIS suggests a trail would require additional ROW in certain areas, VDOT should seek to reduce those impacts by fitting as much of the trail within the existing project right-of-way minimizing impacts to neighbors.
It is also essential that VDOT provide a safe and consistent trail for its entire length to ensure maximum use for all ages. Circuitous routes outside the immediate I-66 corridor is inefficient, confusing, and will reduce its successfulness. If absolutely necessary to use alternative routes, upgrading the bike and pedestrian facilities, including wayfinding signage would be critical.
I also urge you to address bike and pedestrian crossings at Rt. 50, 123 and other significant interchanges and crossings where bridges are not being rebuilt.
Now is the time to take the long view. Providing safe accessible connections for people to bike and walk to transit, and along and across the I-66 corridor, will offer residents and commuters transportation options that are truly a multi-modal solution.
Labels: i-66, I-66 multimodal study
Comment on proposed Fairfax Center plan changes
Between now and May 22, 2015, Fairfax cyclists have an opportunity to recommend changes for better bicycle access to the Fairfax Center Area as part of proposed changes to the Fairfax County Comprehensive Plan. More info is at www.fairfaxcounty.gov/dpz/fairfaxcenter. The Fairfax Center area is just west of Fairfax City generally between Route 50 in the north and Route 29 in the south.Your recommendations may be considered by county staff, reviewed by a planning task force, considered at a public hearing, and approved by the Board of Supervisors. A long process, but it's the way important changes are made in the county.
Cyclists are needed to review the recently approved Bicycle Master Plan Route Map to ensure that it is properly referenced in the plan being considered. The proposed plan includes information about a future rail station at Fair Oaks Mall, community design standards, and planned improvements in the City of Fairfax. The Bicycle Master Plan is referenced but we think more specific bike information should be included in the Center plan. Maybe you have a solution to improving bicycle access to Fair Oaks Mall and the County Government Center from surrounding neighborhoods and Fairfax City, which is only 1.5 miles away.
FABB is inviting interested advocates that are familiar with the planning area to review and comment on the planning document under review. Advocates are welcome to send their comments directly to the county but are asked to also send a copy to FABB at info@fabb-bikes.org.
Thanks to Howard Albers of FABB for providing the above information.
Labels: fairfax center, I-66 multimodal study
Hearings announced for I-66 outside-the-beltway project
This is another great opportunity for bicyclists and other citizens concerned about transportation options in Fairfax to provide comments to VDOT. We’ll be posting our comments on the latest plans after they are released 15 days before the hearings.
![]() |
| Project Area Slide by VDOT |
By Steve Ward.
Labels: hearings, i-66, I-66 multimodal study
Current plans for bike facilities on I-66 bridges to be rebuilt
At the March FABB meeting representatives from VDOT discussed the current planning for bike facilities on the bridges across I-66 that will be rebuilt as part of the I-66 outside the Beltway project. Not all bridges will be modified, including the Stringfellow Rd bridge.For more info, consider attending the forum tonight, I-66 and Our Neighborhoods beginning at 7pm at Oakton High School. The meeting is open to all but RSVP is appreciated.
Labels: i-66, I-66 multimodal study
I-66 Forum and Mason District bike meeting Wednesday
Two important bike-related meetings are planned for Wednesday, March 25:FABB is co-hosting I-66 and Our Neighborhoods, a forum on the I-66 outside the Beltway project. Learn more about the project and hear comments from Supervisor Smyth, Stwart Schwartz of the Coalition for Smarter Growth, and reps from VDOT, Fairfax DOT, and the Fairfax Transportation Advisory Commission. The meeting is from 7pm – 9pm at Oakton High School, 2900 Sutton Road, Vienna, VA 22181.
This is a great opportunity to voice concerns about the project's effects on our community and ask that bicycling and walking be an integral part of VDOT's multi-modal solutions to the I-66 corridor.
There will be a brief panel discussion followed by an extended open forum Q&A.
Moderated by Stewart Schwartz, Coalition for Smarter Growth
Speakers from Virginia Department of Transportation, Fairfax County
Department of Transportation, and Transportation Advisory Commission
Closing comments by Tania Hossain, Providence District Council
Labels: i-66, I-66 multimodal study, mason district, repaving
I-66 discussion at FABB meeting on Wed.
Representatives from VDOT will discuss the I-66 Multimodal Study Outside the Beltway at the FABB monthly meeting tomorrow evening, Wednesday, March 18 starting at 7:30 p.m. Note that this month we are meeting at Braddock Hall, adjacent to the Braddock District offices, 9002 Burke Lake Rd, Burke, VA 22015.Labels: i-66, I-66 multimodal study, vdot
Public forum on I-66 March 25
FABB is co-sponsoring a public forum on the I-66 Project Outside the Beltway, I-66 & Our Neighborhoods on Wednesday, March 25 from 7:00 - 9:00 p.m. (registration begins 6:30). The meeting will be held at Oakton High School cafeteria, 2900 Sutton Road, Vienna. From the I-66 forum flyer:What are VDOT’s plans for I-66 outside the Beltway? We want to know your concerns on:
- Impacts on homes and neighborhoods
- Biking and walking access
- Transit-oriented transportation alternatives
- Impacts on parks, streams & habitats
- Trafic, congestion & pollution
- Introductory remarks by Providence District Supervisor Linda Smyth
- Moderated by Stewart Schwartz, Coalition for Smarter Growth
- Speakers from Virginia Department of Transportation, Fairfax County Department of Transportation, and Transportation Advisory Commission
- Closing comments by Tania Hossain, Providence District Council
visit www.smartergrowth.net/I66 or the FABB I-66 Info Page.
Sponsored by Providence District Council, Coalition for Smarter Growth, Virginia Sierra Club, Fairfax Advocates
Labels: i-66, I-66 multimodal study