Monday, February 1, 2016
 

I-66 Message Sent to I-66 Parallel Trail Supporters

Kudos to all the supporters who spoke up to make biking and walking an integral part of the I-66 Outside the Beltway improvements. You certainly made an impact. In its revised Tier II Environmental Assessment, the Virginia Department of Transportation stated that,
“Based on substantial public interest a corridor-wide bikeway and pedestrian plan was developed.”
Click on image to view map
Your help is needed to continue offering a strong voice and guidance in support of the I-66 bicycle plan. Please let VDOT know you support the bike plan and provide your feedback on trail placement, access points and other concerns you may have.

Comments can be submitted until February 4th (Deadline was extended to Feb. 9). Please direct them to Ms. Susan Shaw, PE, by email to Transform66@VDOT.Virginia.gov, via the online comment form on the project's website, or join the discussion. Reference "I-66 Tier 2 Revised EA" in the subject line.

The revised Tier II Environmental Assessment was recently released for public review and comment with updated language integrating the bicycle and pedestrian improvements approved as part of the I-66 Prefferred Alternative.

According to the revised EA, the I-66 project will include a major regional trail along the I-66 corridor outside the beltway (click on image to see map) as well as new bicycle and pedestrian facilities on all rebuilt bridges. The report states that including these improvements will increase access to public transportation, travel choices, connectivity and safety throughout the I-66 corridor.

Specific design requirements for the bicycle infrastructure was also recently released as part of the I-66 Request for Proposals, which included the draft Technical Requirements.

Here are some key things you should know from these documents:
  • The regional trail will be a combination of a parallel trail constructed within the I-66 right-of-way as part of the project, and improvements to adjacent roads and trails that will be built separately in coordination with local jurisdictions.
  • Bike and pedestrian improvements at I-66 crossings are included where bridges are being reconstructed.
  • All new facilities crossing I-66 or associated ramps shall be grade-separated unless otherwise approved by VDOT.
  • Where proposed noise barriers are to be located near homes, the parallel trail will be on the I-66 side of the noise barrier.
  • There are 13 access points proposed for the parallel trail, along with the suggestion that access generally be at half-mile increments.
  • Park-and-ride facilities will include bike and pedestrian connections to nearby facilities, and covered bike racks for a minimum of 75 bicycles.
  • Mile marker and wayfinding signs shall be incorporated in the design.
  • Existing trails impacted by the project shall be replaced.
For more information on efforts to include bike facilities in the I-66 project, visit FABB's I-66 page.

Thank you for your support,

Sonya Breehey
FABB Board Member

Labels: ,

(3) comments
Saturday, January 23, 2016
 

VDOT Releases Latest I-66 Environmental Assessment Docs

I-66 Trail at Route 123
VDOT recently released the I-66 Outside the Beltway Tier 2 Environmental Assessment (EA) documents. The project includes a major regional trail parallel to I-66 from Gallows Road to the Fairfax County border as well as  new bike and ped facilities on rebuilt bridges. We are asking cyclists to contact VDOT by February 4 to support bike access along and across I-66. Please reference "I-66 Tier 2 Revised EA" in the subject.

See the Fairfax County portion of the Parallel Trail map. The trail would extend the Custis Trail located inside the Beltway. See the FABB I-66 Info Page for other supporting documents.

The Federal Highway Administration requires the preparation of an EA when VDOT conducts a significant project like the expansion of the I-66 corridor. According to the document, "This Tier 2 Revised EA is being made available for a 15-day public review and comment period. All comments received on the Tier 2 Revised EA will be considered and substantive comments will be addressed prior to finalizing the Tier 2 EA process and prior to a Tier 2 NEPA decision by FHWA." Comments are due February 4.

From VDOT: "Submit your written comments on the Tier 2 Revised EA by February 4, 2016 to Ms. Susan Shaw, PE, by email to Transform66@VDOT.Virginia.gov or via the online comment form on the project's website or join the discussion. Please reference "I-66 Tier 2 Revised EA" in the subject line for all correspondence."

Earlier VDOT released the Requests for Proposals that included Technical Requirements which contained proposed locations where the parallel trail can be accessed from adjacent neighborhoods. We will post our analysis of those points soon.

From the report:
3.4.2.6 Bicycle and Pedestrian Elements
The bicycle and pedestrian accommodation recommendations would support the overall purpose and need of the project, seeking to achieve the following objectives:
  • Increase access to public transportation
  • Increase travel choices
  • Increase bicycle and pedestrian connectivity for communities within the I-66 corridor
  • Accommodate safe and efficient bicycle and pedestrian travel within the I-66 corridor
  • Integrate existing and planned bicycle and pedestrian networks in communities along the I-66
  • corridor
Bicycle Network
Accommodating bicycles strategically along and crossing the I-66 corridor could provide substantial benefits to the transportation system, benefits to the environment, and improvement to people’s quality of life. Bicycling is a healthy, efficient, and affordable transportation alternative. It can dramatically enhance people’s access to transit and related facilities, connect neighboring communities, improve people’s health, and reduce people’s reliance on a personal automobile for short and moderate-distance trips.

Fairfax County and Prince William County have invested substantially in bicycling infrastructure, and along with transportation-related associations, the counties have also invested in programs to encourage and expand bicycling. Currently, I-66 is a barrier to bicycle network connectivity in many locations outside the Beltway (I-495). The modification of bridges, ramp termini, the freeway mainline, and some local roadways offers the opportunity for bicycling networks along the corridor (existing and planned) to become better connected.

Labels: , ,

(0) comments
Sunday, December 6, 2015
 

I-66 Meeting on Tues. Dec 8 - Support the Parallel Trail

FABB has been advocating for construction of a trail parallel to I-66 outside the Beltway as part of the proposed widening project. The trail  is included on the county Comprehensive Plan and has the support of the Board of Supervisors. With help from cyclists who have contacted VDOT, the trail is now included in the plans, but we are going to have to continue to speak out in support of this trail.

On December 8 you will have an opportunity to speak to the Commonwealth Transportation Board (CTB) to support plans for extension of the Custis Trail I-66 outside the Beltway. The meeting will be held at George Mason High School, 7124 Leesburg Pike, Falls Church from 6-8 pm. Cyclists are encouraged to attend the meeting and sign up to speak in favor of the proposed parallel trail and bike facilities on the rebuilt bridges.

Information about the meeting is posted on the Tranform66.org meetings page. See FABB's previous coverage of the project and info about our efforts to ensure that safe, convenient bike facilities are included. If the project goes forward, bicyclists should be able to travel safely along this congested corridor to commute and take short trips. The county Trails Plan and Bicycle Master Plan recommend including the parallel trail.

There are also great opportunities to improve bicycle facilities through the Inside the Beltway project. Tolling of I-66 inside the Beltway would generate an estimated $10 million/year, funds that can be used for improvements to transit, bicycling, walking and other modes. Without strong support from the public for this plan, it could easily be jettisoned as there is strong opposition from legislators whose agenda is to widen 66 inside the Beltway.

If you cannot attend the meeting you can provide comments at Transform66@vdot.virginia.gov.

Labels: ,

(0) comments
Monday, November 23, 2015
 

CTB Public Meeting on I-66 on Dec. 8

On December 8 the public will have an opportunity to speak to the Commonwealth Transportation Board (CTB) about plans for changes to I-66 inside and outside the Beltway. The meeting will be held at George Mason High School, 7124 Leesburg Pike, Falls Church from 6-8 pm. Cyclists are encouraged to attend the meeting and sign up to speak in favor of the proposed parallel trail and bike facilities on the rebuilt bridges. The parallel trail would be an extension of the very popular Custis Trail inside the Beltway.

Information is not yet posted on the Tranform66.org meetings page but it should be there soon. See FABB's previous coverage of the project and info about our efforts to ensure that safe, convenient bike facilities are included. If the project goes forward, bicyclists should be able to travel safely along this congested corridor to commute and take short trips. The county Trails Plan and Bicycle Master Plan recommend including the parallel trail. It has also been endorsed by the Board of Supervisors.

If you cannot attend the meeting you can provide comments at Transform66@vdot.virginia.gov.

Labels: , ,

(0) comments
Monday, November 2, 2015
 

Nov-Dec 2015 FABB Newsletter

November-December 2015 FABB News
A bi-monthly publication of Fairfax Advocates for Better Bicycling
www.fabb-bikes.org

Board of Supervisors and School Board Candidate Survey Responses

On November 3, all members and the Chairman of the Fairfax County Board of Supervisors are up for re-election as are all members of the county School Board. FABB recently sent questions regarding bicycling in Fairfax County to candidates for the Board of Supervisors and a separate set to candidates for the School Board. We received responses from 12 of 19 Board of Supervisors candidates and 19 of 24 School Board candidates.

See the Board of Supervisors candidate responses and the School Board candidate responses.

All Board of Supervisors candidates who responded agreed with the statement "Do you support safe bicycling as an integral part of the overall transportation options in Fairfax County."  Three quarters or 75% of respondents said they support implementing the Bicycle Master Plan recommendation to "Allocate an annual budget dedicated to bicycle planning and program initiatives." All School Board candidates who responded to the survey generally agreed with the statement "The school system and school board should be doing more to enable FCPS students to walk and bike to school instead of driving or being driven."

FABB does not endorse candidates. We provide the information so that you can better understand candidates' views on improving bicycling in Fairfax.

Extension of Custis Trail Included in I-66 Outside the Beltway Project

Proposed Bike facilities at Nutley StOn October 27, the Virginia Commonwealth Transportation Board approved the latest plans for the widening of I-66 Outside the Beltway. The plans include the parallel trail that will serve as an extension of the very popular Custis Trail, which is located inside the Beltway. The rebuilt bridges also will include new ped/bike facilities. We are very encouraged that the parallel trail is now included as an integral part of the project and that most of the ramp crossings are grade-separated using either bridges or tunnels.

Unfortunately much of the trail is located on the highway side of the soundwalls, mostly due to opposition from residents living adjacent to I-66, particularly in the Dunn Loring area. As the project moves forward we hope residents will begin to understand the major benefits of having access to this trail and that the final design will be modified to reflect that support.

Adam Lind Named as New Fairfax County Bike Coordinator

AAEAAQAAAAAAAATQAAAAJDZmNzljMzUwLWM3Y2MtNGI2Ny1hZmRkLTUxNDBlZGI5ZTU3YgFairfax County recently named Adam Lind as the new Bicycle Program Manager, commonly referred to as the Bike Coordinator. Adam has been serving as the acting Bike Coordinator since Charlie Strunk retired in January of this year. Congratulations Adam!

Adam has done a great job as acting coordinator, working with VDOT on the creation of more than 34 miles of new bike lanes as part of this summer's repaving program. The work included conducting numerous meetings around the county to seek comments on individual projects. He is developing a plan to implement bike sharing in Reston. Most recently he has worked with VDOT on the design of the I-66 parallel trail and other bike facilities related to the project.

See the FABB blog for more info on Adam.

Soapstone  Connector Across Dulles Toll Road in Reston to Provide New Bike Access

soapstone-connectorLast week Fairfax County presented the latest plans for the Soapstone Connector, which will extend Soapstone Drive from Sunrise Valley Drive to Sunset Hills Road across the Dulles Toll Road. With limited crossings of the Toll Road, intersections around the Reston Parkway and Wiehle Ave. crossings become very congested during rush hour, making them especially dangerous for pedestrians and bicyclists. The Soapstone Connector will provide a new way for cyclists and pedestrians to safely cross the Toll Road and access the Wiehle-Reston East Metrorail station and other destinations on both sides of the Toll Road. Bike lanes are included in the project and serve as an extension of the current bike lanes on Soapstone Dr.

Unfortunately the proposed road will extend only to Sunset Hills Road on the north where no bike facilities exist. The W&OD Trail is located a short distance north of Sunset Hills Road but there are no nearby connections to the Trail. Please contact the county and ask that a connection to the W&OD Trail be included in the project. Deadline for comments is November 6. Email comments to audra.bandy@fairfaxcounty.gov.

Support the Proposal for Paving Cross County Trail in Wakefield Park

Fairfax Co. Park Authority has proposed to pave a section of the Cross County Trail through Wakefield Park. The trail is heavily used by commuter and recreational cyclists. The unpaved trail is in poor condition and is difficult for most transportation bikers to navigate. A paved surface will be easier to maintain and would provide a much better surface for most trail users with minimal adverse effects on the environment. Cyclists are encouraged to send a message to Project Manager Bill Boston, William.boston@fairfaxcounty.gov, to voice support for paving the trail segment. See the FABB blog for more info.

County to Apply for Federal Funds for Bike Projects

At their October 20 meeting, the Board of Supervisors endorsed four bike project applications to VDOT and the Metropolitan Washington Council of Government's Transportation Planning Board for FY2017 Transportation Alternative funding. See the Board Agenda for details (Action Item 3):

  • Vienna Metrorail Bicycle Access Improvements: $400,000 [Application postponed until after planned Vienna Metrorail construction is completed.]
  • Cinder Bed Bikeway: $400,000
  • Van Dorn Street Bicycle and Pedestrian Improvements: $400,000
  • Reston Bike Share Capital Equipment: $400,000 (See FABB blog for details of recent Reston bikeshare meeting.)
Fairfax County SRTS Coordinator Conducts Bike Safety Classes

ffx-srtsUsing Safe Routes to School grant funds, Fairfax County Public Schools (FCPS) has purchased 30 bikes and 6 Strider bikes for bicycle safety lessons at elementary schools. Week-long lessons were conducted at 12 elementary schools last spring for grades 4, 5, and 6, reaching over 8,000 students. Students at several more schools received lessons this fall. Additional grant funds will be used to purchase more bikes to expand the bike program to middle schools. Lessons include bike skills, safety education, signaling, and road simulation riding.

Elementary schools where classes have been held include: Island Creek, Kings Glen, Rolling Valley, Stratford Landing, Washington Mill, Greenbriar West, Lane, Hollin Meadows, Canterbury Woods, North Springfield, West Springfield, Colin Powell, Fort Hunt, Hunters Woods, and Rose Hill. Kudos to Sally Smallwood, FCPS SRTS Coordinator for implementing this program. We hope the program can grow in the near future to allow all elementary students to learn safe bicycling skills. See the Fairfax SRTS Newsletter for more info.

Fairfax County Parkway Trail Restored Between Fox Mill and Pinecrest Roads

Fairfax Water recently replaced a major water main adjacent to Fairfax County Parkway. Major construction work required removing and relocating the Parkway trail. Fortunately, Fairfax Water provided a paved detour throughout the long construction phase, which lasted for several years. In October, construction was completed and the original trail was replaced and opened. We want to thank Fairfax Water for their diligent efforts toward maintaining trail access during the construction period.

Help FABB Identify Bike Rack Locations in Fairfax County

To improve bike parking in the county, help us locate and map existing bike racks. Rackspotter is a web-app that Arlington County is using to map bike racks. The application is now available for mapping racks in the greater DC area. The app allows you to identify the rack type, capacity, and location. You can also add a photo of the rack. As you travel around the county, why not take a minute to map bike racks that you encounter.
-----
If you don't already, please Like us on Facebook and follow our Twitter feed. If you have news about bicycling in Fairfax to share with our readers, please submit brief articles to news@fabb-bikes.org.

Upcoming Events

  • November 18, Wednesday - FABB Monthly Meeting in Vienna at 7:30 p.m.
  • December 16, Wednesday - FABB Monthly Meeting at Mosaic District at 7:30 p.m.
  • December 19, Saturday - Tour de Lights in Reston, 4:30-6 p.m.

Labels: , , , , , , , , , ,

(0) comments
Friday, October 9, 2015
 

GGW article on I-66 parallel trail

I-66 parallel trail in green along N
side at Nutley St.
The Custis Trail is going to get a lot longer is the title of an article by Canaan Merchant of Greater Greater Washington. As we've said in the past, we're excited that plans for the trail are now an integral part of the I-66 Outside the Beltway project. From the GGW article:
This would be a big boost for area trails

Building out the entire thing would make the Custis Trail one of the longest trails in the region. It'd be up there with the W&OD Trail's 45 mile long path, and it'd dwarf other well know trails in the area like the Mount Vernon Trail (18 miles) or the Capital Crescent Trail (11 miles). You'd be able to take the trail all the way from the Key Bridge to Manassas Battlefield National Park and beyond.

Working new trails in with road plans is a way to make sure that even highway expansions are, in their own way, bike and walking-friendly. For such efforts to be successful, though, trails have to both get built and is adequate for people's needs. Otherwise the trail just gets seen as a simple amenity rather than a necessary part of the area's transportation infrastructure.
The latest plans are online in several detailed segment drawings and an overview drawing of the proposed trail in Fairfax County. The detailed drawings indicate that most of the parallel trail ramp crossings will be grade-separated, similar to those on the Custis Trail. The latest design indicates that less right of way will be needed than was earlier thought, which should reduce concerns from residents.

VDOT is holding meetings in Fairfax on Oct. 19 & 20. These meetings are a great opportunity for area cyclists to voice their support for this new trail. Just because the trail is shown on plans does not mean it will be built. Your support is critical.

Monday, October 19, 2015Oakton High School
2900 Sutton Road, Vienna, VA 22181

Tuesday, October 20, 2015VDOT Northern Virginia District Office
4975 Alliance Drive, Fairfax, VA 22030

Labels: , , ,

(0) comments
Friday, October 2, 2015
 

I-66 Outside the Beltway detailed plans now available

I-66 at Nutley St, parallel trail shown as solid green line
The drawings for the I-66 Outside the Beltway project are now available on the VDOT website. We are very encouraged that the parallel trail on the north side of I-66 is an integral part of the project. Many of the ramp crossings are grade-separated using either a tunnel or bridge to allow safer crossings of the high speed ramps. Kudos to VDOT for including the trail, an extension of the Custis Trail, in their plans.

Also shown on the drawings are the bike facilities across the bridges that will be rebuilt as part of the project. In the Nutley/I-66 drawing on the right you can see "Proposed Shared Use Paths" as solid green lines. The parallel trail is on the north side weaving through the interchange with bridges or tunnels crossing the ramps. The dashed green line in the upper left is the "Proposed Shared Use Path (By Others)," which in this case would be a section of the parallel trail built by Fairfax County.

There's a great deal of information in a large number of drawings. These will be printed and placed in sequence at the public information meetings planned later this month. Cyclists are encouraged to attend these meetings and learn more about the proposed bike facilities and support VDOT's trail proposal. Even if you don't support the expansion of I-66, if the project is built, we strongly support the trail proposals.

I-66 Outside the Beltway meetings held between 6:30 and 8:30 (as per comment below):
Monday, October 19, 2015,
Oakton High School
2900 Sutton Road, Vienna, VA 22181

Tuesday, October 20, 2015VDOT Northern Virginia District Office
4975 Alliance Drive, Fairfax, VA 22030

Labels: , ,

(4) comments
Tuesday, September 15, 2015
 

I-66 Preferred Alternative Includes Parallel Multi-use Trail

Today VDOT released their preferred option for the I-66 Outside the Beltway widening project, called the Preferred Alternative. According a video describing the Preferred Alternative design, the parallel trail is included, either inside the right-of-way or on local streets. Bike and ped facilities are also planned on the rebuilt bridges across I-66.


The image above shows in blue where the trail is located inside the right-of-way, and in yellow on local streets. Two major sections in Fairfax County are located on local streets, between Nutley Street and Blake Lane and between Route 50 and the Fairfax Co Parkway. Major changes will likely be needed to make those local roads bike-friendly.

Inside the I-66 right-of-way (east to west): Gallows Road to Nutley Street, Blake Lane to Route 50, Fairfax Co Parkway to Route 29.

Local streets (east to west): Nutley Street to Blake Lane (either Virginia Center Blvd/Country Creek Rd on the north or Saintsbury Dr on the south), Route 50 to Fairfax Co Parkway (possibly Random Hills Rd to Monument Dr to Fair Lakes Parkway), and Route 29 to Haymarket.

It's critical that cyclists attend upcoming meetings to learn more about the plans and to support a safe, connected parallel trail:

Monday, October 19, 2015
Oakton High School
2900 Sutton Road, Vienna, VA 22181

Tuesday, October 20, 2015
VDOT Northern Virginia District Office
4975 Alliance Drive, Fairfax, VA 22030

From the Preferred Alternative Video:
Bikeways, trails and/or sidewalks will be constructed on bridge crossings impacted by the project. In coordination with local partners, and consistent with previous planning efforts, a trail concept parallel to the I-66 corridor has been developed. In the preferred alternative, the parallel trail will be located in the I-66 right-of-way and on local streets. TDM strategies will include support for bicycling and walking.

Labels: ,

(1) comments
Monday, July 13, 2015
 

FABB meeting on Wednesday in Vienna

Everyone is invited to attend the next FABB meeting on Wednesday, July 15 starting at 7:30 p.m. at Patrick Henry Library in downtown Vienna. We'll get a report on the latest county bicycle news from acting bike coordinator Adam Lind. We'll also discuss the upcoming Clips Beer & Film Tour event in Reston on September 10 and the latest information on bicycle facilities as part of the I-66 Outside the Beltway project. On Thursday some FABB members plan to meet with Chairman Bulova and transportation staff to discuss the best alternatives for building the I-66 parallel trail.

Labels: , , ,

(0) comments
Thursday, July 2, 2015
 

Fairfax Times article on proposed I-66 trail

FABB riders on the Custis Trail
A discussion of the proposed I-66 trail is the subject of the Fairfax Times article by Kali Schumitz, Proposed I-66 trail sparks debate: New artery would expand opportunities for cyclists. The trail would provide a tremendous asset for Fairfax County residents and allow a significant percentage of the county population to take short trips by walking and biking. However, it would also impact several properties adjacent to I-66.
Cyclists in the Interstate 66 corridor are hoping that the proposed highway widening project also will create an opportunity to add new bike facilities.

However, for residents in Dunn Loring and Oakton already concerned about the highway encroaching into their yards and a community school, one proposed bike trail signifies to them another 10 feet of property that they might lose.

“There is simply no physical way to fit a bike lane in the I-66 corridor, at least through Vienna. Simply adding extra travel lanes is stressful enough,” Sen. Chap Petersen (D-Dist. 34) wrote on his Ox Road South blog, expressing the concerns of his constituents. “There’s no point in reducing the right of way take for new lanes, if you’re simply going to take it for a bike path.”
Sen. Peterson opposes the multi-use trail, which he constantly refers to as a bike lane. In an op-ed article in the Reston Connection he said " Why do we have to accommodate ten lanes, plus a bike lane? We need to get I-66 right. Yes, the solution should be multi-modal, with buses and trains playing a major role." Without safe, convenient bicycle and pedestrian access to those buses and trains, the project will not be multi-modal.

We were also quoted in the article:
Bruce Wright, chairman of Fairfax Advocates for Better Bicycling, said his organization is working with VDOT to ensure that the project includes bike facilities that were planned for in the county’s bicycle master plan and other planning documents.

For example, this includes adding bike and pedestrian facilities to bridges across I-66 that would be replaced due to the road widening. A similar effort was made when the 495 Express Lanes were being constructed.

“This is a great opportunity to provide safe, convenient bike and pedestrian access,” Wright said.

The biggest point of contention is a potential major trail that runs parallel to I-66, like the Custis Trail in Arlington County, which connects the Washington & Old Dominion Trail to the Key Bridge in Rosslyn.

Wright said the high number of both commuters and recreational users of the W&OD and the Custis Trail show that there is great demand for these types of major trails.

“What we really need are better first-class trails for everyone,” he said.

Labels: , ,

(0) comments
Thursday, May 28, 2015
 

FABB's I-66 Public Hearing Comments

Over 20 citizens spoke last night at the first public hearing on the I-66 Outside the Beltway project. Almost all speakers voiced support for transit over widening the road. Several speakers said they moved to the Dunn Loring area to be in a walkable/bikeable neighborhood that would be negatively impacted by the project. FABB's Sonya Breehey spoke on behalf of FABB in support of the extension of the Custis Trail parallel to I-66 and bike/ped facilities on the rebuilt bridges.

You can support this effort by telling VDOT to include the parallel trail as part of the project. Attend the second public hearing tonight at Oakton High School, 2900 Sutton Road, Vienna, VA 22181, from 5:30-9:00. See the FABB Blog and FABB I-66 Info Page for more info. Written comments may be submitted through June 18th by email to Transform66@VDOT.Virginia.gov. Your comments do make a difference.

Below are FABB's public hearing comments:
I-66 Outside the Beltway Public Hearing Comments
By Sonya Breehey
May 28, 2015

I think we all agree that improvements to the I-66 corridor are necessary but to truly transform I-66 for the future, we need long-term solutions that are legitimately multi-modal, maximizing public transit, and biking and walking connectivity.

I truly appreciate the incorporation of bicycle and pedestrian facilities for reconstructed bridges. These connections are imperative to ensuring this massive highway project does not sever neighborhoods, and that our bridges remain a humane place for residents to walk and bike transit, schools, or anywhere they need to go.

I am concerned however that while the Tier II Environmental Impact Statement indicates VDOT has studied the feasibility of a parallel bicycle facility; the trail still has not been included in the project.

An I-66 parallel trail would provide significant connectivity to the northern Virginia transportation trail network.  A recent study showed that 25% of Fairfax County residents live within a mile of I-66 or within 1/2 mile of either the Fairfax Co Parkway or W&OD Trails, both of which would be connected by an I-66 parallel trail.

In fact, over 500 county residents provided comment to VDOT asking that a parallel trail be part of your multi-modal solutions.

They know, as do I, that a parallel trail along I-66 could provide direct access for biking and walking from neighborhoods to:

  • Current and future public transit, and park and ride lots;
  • Suburban centers like Merrifield, Fairfax Corner and Fair Oaks; and
  • Employment centers throughout central Fairfax County.
This bike and pedestrian connectivity is what will help make any TDM program more successful.

While the EIS suggests a trail would require additional ROW in certain areas, VDOT should seek to reduce those impacts by fitting as much of the trail within the existing project right-of-way minimizing impacts to neighbors.

It is also essential that VDOT provide a safe and consistent trail for its entire length to ensure maximum use for all ages. Circuitous routes outside the immediate I-66 corridor is inefficient, confusing, and will reduce its successfulness.  If absolutely necessary to use alternative routes, upgrading the bike and pedestrian facilities, including wayfinding signage would be critical.

I also urge you to address bike and pedestrian crossings at Rt. 50, 123 and other significant interchanges and crossings where bridges are not being rebuilt.

Now is the time to take the long view.  Providing safe accessible connections for people to bike and walk to transit, and along and across the I-66 corridor, will offer residents and commuters transportation options that are truly a multi-modal solution.

Labels: ,

(0) comments
Monday, May 4, 2015
 

Comment on proposed Fairfax Center plan changes

Between now and May 22, 2015, Fairfax cyclists have an opportunity to recommend changes for better bicycle access to the Fairfax Center Area as part of proposed changes to the Fairfax County Comprehensive Plan. More info is at www.fairfaxcounty.gov/dpz/fairfaxcenter. The Fairfax Center area is just west of Fairfax City generally between Route 50 in the north and Route 29 in the south.

Your recommendations may be considered by county staff,  reviewed by a planning task force, considered at a public hearing, and approved by the Board of Supervisors. A long process, but it's the way important changes are made in the county.

Cyclists are needed to review the recently approved Bicycle Master Plan Route Map to ensure that it is properly referenced in the plan being considered. The proposed plan includes information about a future rail station at Fair Oaks Mall, community design standards, and planned improvements in the City of Fairfax. The Bicycle Master Plan is referenced but we think more specific bike information should be included in the Center plan. Maybe you have a solution to improving bicycle access to Fair Oaks Mall and the County Government Center from surrounding neighborhoods and Fairfax City, which is only 1.5 miles away.

Also, we are concerned that previously approved applications appear not to have included basic bicycle accommodations, according to the table on page 57 of the Fairfax Center Area Study Staff Report. Bicycle parking facilities were either not included or were not considered essential in commercial and residential developments, and no bicycle support facilities were included.

In a few weeks more information will be available concerning a parallel bicycle trail along I-66 as it will have a profound impact to the Fairfax Center community.

FABB is inviting interested advocates that are familiar with the planning area to review and comment on the planning document under review. Advocates are welcome to send their comments directly to the county but are asked to also send a copy to FABB at info@fabb-bikes.org.

Thanks to Howard Albers of FABB for providing the above information.


Labels: ,

(0) comments
Tuesday, April 28, 2015
 

Hearings announced for I-66 outside-the-beltway project

The Virginia Department of Transportation (VDOT) has announced that it will host public hearings in late May and early June on an upcoming environmental assessment for the Transform 66 Outside the BeltwayProject. The Fairfax County hearings are May 27 & 28. Details are below.

This is another great opportunity for bicyclists and other citizens concerned about transportation options in Fairfax to provide comments to VDOT. We’ll be posting our comments on the latest plans after they are released 15 days before the hearings.

Project Area Slide by VDOT
You can review project information at www.transform66.org, at the public hearings, or at VDOT's Northern Virginia District Office at 4975 Alliance Drive in Fairfax beginning May 12, 2015. VDOT says that preliminary plans, project schedule, and right-of-way, environmental and civil rights information, will be available for review.  Written comments may be submitted by mail to Ms. Susan Shaw, Megaprojects Director, at the VDOT District Office address above, or by email to Transform66@VDOT.Virginia.gov. Please reference "Transform 66 Outside the Beltway Public Hearing" in the subject line. Comments must be postmarked, emailed or delivered to VDOT by June 18, 2015 to be included in the public hearing record.

The hearing schedule is as follows, with all hearings running between 5:30 - 9:00 p.m. with a brief presentation at each hearing beginning at 7:00 p.m.

Wednesday, May 27, 2015
VDOT Northern Virginia District Office
4975 Alliance Drive, Fairfax, VA 22030

Thursday, May 28, 2015
Oakton High School - Cafeteria (Entrance #1 or #14)
2900 Sutton Road, Vienna, VA 22181

Tuesday, June 2, 2015
Battlefield High School - Cafeteria (Entrance #1 or #4)
15000 Graduation Drive, Haymarket, VA 20169

Wednesday, June 3, 2015
Bull Run Elementary School - Cafeteria (Entrance #1)

15301 Lee Highway, Centreville, VA 2012

By Steve Ward.

Labels: , ,

(0) comments
Wednesday, March 25, 2015
 

Current plans for bike facilities on I-66 bridges to be rebuilt

At the March FABB meeting representatives from VDOT discussed the current planning for bike facilities on the bridges across I-66 that will be rebuilt as part of the I-66 outside the Beltway project. Not all bridges will be modified, including the Stringfellow Rd bridge.

For more info, consider attending the forum tonight, I-66 and Our Neighborhoods beginning at 7pm at Oakton High School. The meeting is open to all but RSVP is appreciated.


Labels: ,

(2) comments
Tuesday, March 24, 2015
 

I-66 Forum and Mason District bike meeting Wednesday

Two important bike-related meetings are planned for Wednesday, March 25:

FABB is co-hosting I-66 and Our Neighborhoods, a forum on the I-66 outside the Beltway project. Learn more about the project and hear comments from Supervisor Smyth, Stwart Schwartz of the Coalition for Smarter Growth, and reps from VDOT, Fairfax DOT, and the Fairfax Transportation Advisory Commission. The meeting is from 7pm – 9pm at Oakton High School, 2900 Sutton Road, Vienna, VA 22181.

This is a great opportunity to voice concerns about the project's effects on our community and ask that bicycling and walking be an integral part of VDOT's multi-modal solutions to the I-66 corridor.

There will be a brief panel discussion followed by an extended open forum Q&A.
Introductory remarks by Providence District Supervisor Linda Smyth
Moderated by Stewart Schwartz, Coalition for Smarter Growth
Speakers from Virginia Department of Transportation, Fairfax County
Department of Transportation, and Transportation Advisory Commission
Closing comments by Tania Hossain, Providence District Council
Also on Wednesday Fairfax County is hosting a meeting on two bike projects in the Mason District. Sections of Annandale Road and Evergreen Lane will be repaved this summer and bike lanes will be added. According to Fairfax County:
Each of these two projects proposes to reduce the existing travel lane width, and repurpose the extra space for bike lanes. No travel lanes will be removed. The meeting is being held March 25 at George Mason Regional Library 7001 Little River Turnpike, Annandale, VA 22003. The meeting scheduled fro 7:00 pm to 8:30 pm.
Cyclists are encouraged to attend this meeting to learn more about these important projects and to support the County and VDOT in trying to make Fairfax County more bike-friendly.

Labels: , , ,

(0) comments
Tuesday, March 17, 2015
 

I-66 discussion at FABB meeting on Wed.

Representatives from VDOT will discuss the I-66 Multimodal Study Outside the Beltway at the FABB monthly meeting tomorrow evening, Wednesday, March 18 starting at 7:30 p.m. Note that this month we are meeting at Braddock Hall, adjacent to the Braddock District offices, 9002 Burke Lake Rd, Burke, VA 22015.

Everyone is invited to attend to learn more about proposed bike and pedestrian facilities planned on the many bridges across I-66 that will be rebuilt as part of this project. We've also asked for a briefing on current planning for the extension of the Custis Trail, a parallel paved trail that would extend from the Beltway to the western county border. The plan is included in the Countywide Trails Plan and the Bicycle Master Plan.

See the FABB I-66 Info Page for more details.

Labels: , ,

(0) comments
Friday, March 13, 2015
 

Public forum on I-66 March 25

FABB is co-sponsoring a public forum on the I-66 Project Outside the Beltway,  I-66 & Our Neighborhoods on Wednesday, March 25 from 7:00 - 9:00 p.m. (registration begins 6:30). The meeting will be held at Oakton High School cafeteria, 2900 Sutton Road, Vienna. From the I-66 forum flyer:



What are VDOT’s plans for I-66 outside the Beltway? We want to know your concerns on:
  • Impacts on homes and neighborhoods
  • Biking and walking access
  • Transit-oriented transportation alternatives
  • Impacts on parks, streams & habitats
  • Trafic, congestion & pollution
Join us for a brief panel discussion, then an extended open forum Q&A.
  • Introductory remarks by Providence District Supervisor Linda Smyth 
  • Moderated by Stewart Schwartz, Coalition for Smarter Growth 
  • Speakers from Virginia Department of Transportation, Fairfax County Department of Transportation, and Transportation Advisory Commission
  • Closing comments by Tania Hossain, Providence District Council
WANT MORE INFO?

visit www.smartergrowth.net/I66 or the FABB I-66 Info Page.

Sponsored by Providence District Council, Coalition for Smarter Growth, Virginia Sierra Club, Fairfax Advocates





Labels: ,

(0) comments
Contact FABB via email: info@fabb-bikes.org

Subscribe to the
FABB e-newsletter


Subscribe to posts:
[Atom 1.0] or [RSS 2.0]





  Bike to Work Day 2015 at Wiehle Station

  Transportation choices

This page is powered by Blogger. Isn't yours?

Archives