Bike-Ped Count Volunteers in Reston Needed
Labels: bike count, FCDOT, reston, soapstone drive, springwood drive
Randy Dittberner leaving VDOT
![]() |
| Randy receives FABB Recognition Award |
Randy oversaw the completion of the first road diet project in the county on Lawyers Road in Reston. The project was a great success, reducing traffic crashes by 80% and it was one of the examples used in the FHWA publication Road Diet Informational Guide. VDOT (Randy) also received a National Roadway Safety Award for that project.
Not long after that project was competed Randy managed the Soapstone Dr road diet project that connects to the Lawyers Road bike lanes on the south and the Wiehle-Reston East Metro station to the north via the Sunrise Valley Dr trail. As part of that project Randy installed a loop detector and bicycle symbol so that the presence of a cyclist would trigger the traffic signal to change. In 2012 FABB presented Randy with the FABB Recognition Award for his work on the road diet projects.
Over the past couple of years Randy worked with Fairfax Co DOT staff to complete several miles of bike lanes throughout the county as part of the summer repaving projects. We would see Randy at almost every major bike project meeting, either in his role as VDOT engineer or as in interested cyclist. Randy was a regular bike commuter to VDOT's NoVa offices on West Ox Road.
Randy embodies what any organization would want in a public official. He is hardworking and goes above and beyond the requirements of his position. He can clearly explain complex projects. He is patient and willing to take the time to answer the most detailed questions in a way that anyone could understand. And he's a great guy. Randy, thank you for everything you've done for cyclists in Fairfax County and good luck in your new endeavors.
Labels: lawyers road, Randy Dittberner, road diet, soapstone drive, vdot
FHWA workbook on creating bike facilities during repaving projects
Over the past several years VDOT and Fairfax County have created several miles of bike facilities during our summer repaving season. Federal Highway Administration recently released the report Incorporating On-Road Bicycle Networks into Resurfacing Projects. Two examples from Fairfax County are included in the report, Soapstone Drive and Lawyers Road.From the report:
![]() |
| Soapstone Dr before road diet |
![]() |
| Soapstone Dr after road diet |
Labels: fhwa, lawyers road, repaving, resurfacing, soapstone drive
VDOT Receives National Safety Award for Lawyers Road
Today VDOT received a National Roadway Safety Award for making Lawyers Road and Soapstone Drive safer by implementing a road diet that also created bike lanes. The Lawyers Road project was the first "road diet" in Virginia and has proven to be very successful. FABB was heavily involved in supporting the project. Congratulations to VDOT. Several more road diet projects were implemented this summer, in part based on the success of these two projects.
November 16, 2015(Washington, DC) -- During a national awards ceremony on Capitol Hill, the Roadway Safety Foundation (RSF) and the Federal Highway Administration (FHWA) today honored the Virginia Department of Transportation (VDOT) for its two Reston Road Diet projects, which were designed to increase safety by reducing the number of lanes on 2-mile segments of both Lawyers Road and Soapstone Drive in Fairfax County. Together, these projects jointly received one of 10 2015 National Roadway Safety Awards.
These heavily traveled sections of roadway carry about 10,000 vehicles per day and were prone to excessive speeding. VDOT implemented the Road Diets by cutting the number of through lanes in half to two and adding a center turn lane. There was virtually no cost since the projects were implemented in conjunction with other paving projects. In addition, the extra width of the roadways were converted into bicycle lanes, building on the multimodal transportation network in the Reston area focused on improving safety and mobility of cyclists, pedestrians and motorists. Following project completion, crashes decreased by 69 percent on Lawyers Road and 67 percent on Soapstone Drive.
“We are just pleased that in working with the community, we have been able to put in minor changes that make a major improvement to safety for drivers, cyclists and pedestrians,” said Helen Cuervo, Northern Virginia district administrator for VDOT. “We are making the best use possible of the pavement, and because we’re seizing the opportunity to adjust the designs during regularly scheduled work, these changes come at very low cost.”
CONTACT: Cathy Gillen
cell (443) 463-4449
cathy@thegillengroup.com
Labels: lawyers road, national roadway safety award, road diet, soapstone drive, vdot
Nov-Dec 2015 FABB Newsletter
On October 27, the Virginia Commonwealth Transportation Board approved the latest plans for the widening of I-66 Outside the Beltway. The plans include the parallel trail that will serve as an extension of the very popular Custis Trail, which is located inside the Beltway. The rebuilt bridges also will include new ped/bike facilities. We are very encouraged that the parallel trail is now included as an integral part of the project and that most of the ramp crossings are grade-separated using either bridges or tunnels.
Fairfax County recently named Adam Lind as the new Bicycle Program Manager, commonly referred to as the Bike Coordinator. Adam has been serving as the acting Bike Coordinator since Charlie Strunk retired in January of this year. Congratulations Adam!
Last week Fairfax County presented the latest plans for the Soapstone Connector, which will extend Soapstone Drive from Sunrise Valley Drive to Sunset Hills Road across the Dulles Toll Road. With limited crossings of the Toll Road, intersections around the Reston Parkway and Wiehle Ave. crossings become very congested during rush hour, making them especially dangerous for pedestrians and bicyclists. The Soapstone Connector will provide a new way for cyclists and pedestrians to safely cross the Toll Road and access the Wiehle-Reston East Metrorail station and other destinations on both sides of the Toll Road. Bike lanes are included in the project and serve as an extension of the current bike lanes on Soapstone Dr.Vienna Metrorail Bicycle Access Improvements: $400,000[Application postponed until after planned Vienna Metrorail construction is completed.]- Cinder Bed Bikeway: $400,000
- Van Dorn Street Bicycle and Pedestrian Improvements: $400,000
- Reston Bike Share Capital Equipment: $400,000 (See FABB blog for details of recent Reston bikeshare meeting.)
Using Safe Routes to School grant funds, Fairfax County Public Schools (FCPS) has purchased 30 bikes and 6 Strider bikes for bicycle safety lessons at elementary schools. Week-long lessons were conducted at 12 elementary schools last spring for grades 4, 5, and 6, reaching over 8,000 students. Students at several more schools received lessons this fall. Additional grant funds will be used to purchase more bikes to expand the bike program to middle schools. Lessons include bike skills, safety education, signaling, and road simulation riding.- November 18, Wednesday - FABB Monthly Meeting in Vienna at 7:30 p.m.
- December 16, Wednesday - FABB Monthly Meeting at Mosaic District at 7:30 p.m.
- December 19, Saturday - Tour de Lights in Reston, 4:30-6 p.m.
Labels: adam lind, candidate survey, fabb newsletter, i-66, I-66 multimodal study, rackspotter, safe routes to school, soapstone connector, soapstone drive, transportation alternatives, wakefield park
Soapstone Connector meeting tonight in Reston
Fairfax County plans to build a bridge across the Dulles Toll Road/Access Road as an extension of Soapstone Dr. The Soapstone Connector will extend from Sunrise Valley Dr to Sunset Hills Dr. The County is holding a public meeting tonight to provide an update on the project. The meeting will be held from 6-8pm at South Lakes High School, 11400 South Lakes Drive, Reston, VA 20191. A presentation will be given at 7pm.In Reston the Dulles Toll Road is a major barrier to north-south bike travel. The Soapstone Connector will provide a much needed additional way for northbound cyclists to reach the W&OD Trail, Plaza America, and other locations. Bike lanes are planned on the Connector along with a shared use trail. The new bike lanes will connect to bike lanes on Soapstone Drive to the south. Those lanes extend from Sunrise Valley Drive all the way to Lawyers Road. Many cyclists use this route to connect to the Wiehe-Reston East Metrorail station and destinations to the north.
The proposed Soapstone Connector alignment is a composition of two previously evaluated alternatives and was chosen due to its advantages over the numerous alternatives studied. These advantages include benefits to multi-modal users, connectivity to Soapstone Drive, and minimization of impacts to environmentally sensitive areas.
The typical section of the bridge will include:
- Two (2) travel lanes (one lane in each direction).
- One (1) bike lane in each direction.
- A sidewalk on one side of the roadway and a shared use trail on the other side of the roadway
Labels: soapstone connector, soapstone drive
Lawyers Road featured in national road diet guide
In 2009 VDOT converted Lawyers Road from four lanes normal travel lanes to two normal lanes, two bike lanes, and a center turn lane, known as a "road diet." The main goal of the project was to reduce motor vehicle crashes. It also created a safer road for all road users. The project was the first in Virginia and has been a huge success, reducing crashes by over 70%.See our coverage of the Lawyers Road and Soapstone Drive projects.
We are fortunate to have some very forward thinking engineers in the Northern Virginia District of VDOT who are willing to experiment with new road treatments that make some of our roads safer for everyone.
Labels: lawyers road, road diet, soapstone drive, vdot
Soapstone Connector meeting Wednesday
The crossing would relieve congestion on the Reston Parkway and Wiehle Ave bridges, especially during rush hour. The new bridge would also provide easier access to the areas parallel to the Toll Road as they redevelopment. Bike-bus lanes are proposed on the bridge.
A meeting to discuss the Soapstone Connector Feasibility Study will be held on Wed., March 20 starting at 7 p.m. at South Lakes High School. See a copy of the Soapstone Connector Feasibility Study.
While we would prefer a separated bicycle facility, a shared bike-bus lane should work. They have been successfully used in several cities around the world. See a streetswiki article about bike-bus lanes. There will also be "Facility accommodation for pedestrians." Unfortunately the study does not include a bridge cross section diagram.
One concern for cyclists are the steep grades involved. The area is not flat and each of the proposed options includes 8% grades.
The bridge would eventually tie in to a planned new grid of streets that could help alleviate traffic on Sunset Hills Dr and Sunrise Valley Dr. The grid of streets and bridge would provide many more travel options through the area for motorists, cyclists, and pedestrians and foster mixed-use, transit-oriented development.
It would be good for cyclists to attend this meeting (if you don't plan to attend the FABB meeting held at the same time) and speak out for bike facilities on the bridge.
Labels: Silver line, soapstone drive
Soapstone bike lanes swept
| Sweeping Soapstone Dr bike lanes |
Kudos and thanks to VDOT for being proactive and sweeping the lanes. They aren't much use to cyclists when filled with leaves and debris.
Labels: soapstone drive, street sweeping, vdot
Soapstone bike lane project starts Monday
![]() |
| Soapstone Dr. |
Work will begin on the southern-most segment of the road from south of Lawyers Rd to Glade Dr which is currently only 2 wide lanes. That configuration will not change. This project will link up with the new bike lanes on Lawyers Rd, giving cyclists from the south a very good route leading toward the new Reston-Wiehle Avenue station on the Silver Line.
A big thank you to VDOT for having the vision to modify Soapstone and Lawyers, making both roads safer for everyone and creating dedicated bike facilities for cyclists.
Labels: road diet, soapstone drive
Soapstone Dr road diet planned for next month
![]() |
| Soapstone Dr. |
According to the VDOT news release, which contains additional photos and diagrams: “Here on Soapstone, we’re able to take advantage of a regularly-scheduled repaving project to change the markings at a very low cost to benefit motorists, cyclists and pedestrians,” said Randy Dittberner, VDOT regional traffic engineer. “We appreciate the input from the community at our public meeting over the summer, and the support from Fairfax County for this project.”
Labels: road diet, soapstone drive
A case for bike lanes
| Photo from Fairfax City Patch |
Fairfax City has yet to hop on this bandwagon, but it has been discussed. So, should we? And if so, where do bike lanes make sense?
First, it is important to understand why bike lanes have been all the rage over the past few years. I mean, why not just use sidewalks or paths? Well, bike lanes function more like bike highways for commuters in that they don’t require you to slow down at every street crossing as you do when using a sidewalk or parallel path. It is important for bike commuters to be able to maintain a constant high rate of speed in order to make biking a more competitive alternative to driving (bikers should still stop at traffic lights and stop signs, though I realize many do not). Bike paths on the other hand are more desirable for leisure riders.
Labels: bike lanes, lawyers road, soapstone drive
Meeting on Soapstone Dr bike lanes on Monday
VDOT is proposing to add bike lanes to Soapstone Dr between Glade Dr and Sunrise Valley Dr. The project is similar to the restriping of Lawyers Rd which created almost 2 miles of bike lanes, reduced crashes, and reduced speeds. There was opposition to the Lawyers Rd project and it was only because cyclists attended the two public meetings and spoke out in support of the project that it was approved.According to the Hunter Mill District office, "A public meeting will be held to get community input on possible changes to Soapstone Drive pavement markings after the Virginia Department of Transportation (VDOT) repaving project in the summer. The meeting will take place on Monday, May 9th from 7-9 PM at Terraset Elementary School. VDOT and Fairfax County Department of Transportation staff will be available for a question and answer session."
Please try to attend this important public meeting to learn what is being proposed by VDOT and speak out in support of the project. The bike lanes would connect to the Lawyers Rd bike lanes via the wide curb lanes on Soapstone south of Glade Dr. They would also connect to the shared use path along Sunrise Valley Dr and provide a bike route to the future Metro station at Wiehle Ave. See the public meeting notice on the Hunter Mill Facebook page.
Labels: road diet, soapstone drive