Wednesday, August 29, 2018
New Bike Routes in Reston
VDOT is finishing up work on new bike lanes on South Lakes Drive in Reston as part of the 2018 repaving season. South Lakes Dr was changed from having 2 lanes in each direction to having a single travel lane in each direction and buffered bike lanes. During the
public meeting held in March of this year, residents were opposed to county's proposal, even though traffic counts indicated that traffic flow would be minimally impacted.
As a compromise, VDOT did not reduce the lanes the section of road that includes South Lakes High School as residents felt strongly that full capacity was needed there. As a compromise, an alternate route was identified using Ridge Heights Rd and Soapstone Dr. Ridge Heights will be getting bike lanes later this year and there are already bike lanes on Soapstone.
Today we noticed that FCDOT has placed South Lakes Bike Route signs along the section where the route deviates from South Lakes Dr. Thanks to VDOT and FCDOT for implementing this project and installing wayfinding signs. The massive traffic jams that some residents predicted would occur once school was back in session have not happened; traffic seems to be flowing just fine and we're seen more cyclists using the road. Let's hope that once people discover this new bike facility that many more will join them.
Here is a photo of one of the new bike route signs.
In south Reston there is now an almost complete network of bike routes leading to the village centers, the W&OD Trail, the Metro station, and other destinations. Soon there will be a new separated bike facility along Sunrise Valley Dr that will be important as new residential units are being constructed. Here's a map that we just put together showing the major on-road bike facilities (except for the trail shown along Sunrise Valley Dr leading to the Metro station.
Labels: FCDOT, repaving, reston, vdot, wiehle-reston east
posted by Bruce Wright at 5:51 PM permalink
(0) comments
Monday, April 2, 2018
Springfield District Paving and Restriping Meeting on April 5
Springfield-area FABB members are encouraged to attend the Virginia Department of Transportation (VDOT) and Fairfax County Department of Transportation (FCDOT) public meeting on proposed paving and restriping changes in the Springfield District this Thursday, April 5, from 7:00 to 8:30 p.m. at the Springfield Governmental Center, 6140 Rolling Road, in West Springfield. This meeting, which was postponed from its original February date, gives community members the chance to provide feedback on general traffic safety concerns regarding roads scheduled for repaving and the proposed striping changes.
Proposed striping changes to increase traffic safety for all road users in the Springfield District include wider shoulders on Hooes Road, buffered bike lanes on Huntsman Boulevard, and road redesign with buffered bike lanes on Legato Road between West Ox Road and Fair Lakes Parkway, as well as on Post Forest Drive.
If unable to attend, you can still submit comments at this FCDOT website through April 15, 2018.
Labels: FCDOT, repaving, springfield district, vdot
posted by Steve Ward at 9:26 AM permalink
(0) comments
Saturday, March 17, 2018
March-April 2018 FABB News
FABB News
March-April 2018
A bi-monthly publication of Fairfax Alliance for Better Bicycling
Volunteers Needed for Springfest and Bike to Work Day
Spring is coming and FABB needs your help! Volunteers are needed to staff FABB tables at Springfest on April 21 and Bike to Work Day on May 18. Help FABB get out in the community and promote bicycling as a fun and healthy way to run errands, commute to work and get excercise. Sign up now for Springfest or Bike to Work Day!
Upcoming Repaving Meetings and Comment Deadlines
VDOT and FCDOT continues to hold district specfic public meetings on their plans for 2018 repaving and restriping projects, which include bicycle and other safety improvements. Upcoming meetings will be held in the Mason District on Tuesday, March 13; Hunter Mill District on Monday, March 19; and Springfield District on Thursday, April 5. You're encouraged to attend to speak up in support of the planned addition of new bicycling infrastructure.
County Budget Meetings: Speak Up for Bikes
Fairfax County is seeking public input on its proposed FY2019 budget and is hosting several town hall meetings around the county. This is a great opportunity to speak out for better bicycling in the county. Consider attending a meeting near you one and speaking up or writing in support of: maintaining Safe Routes to School funding for a full-time Coordinator to work with county schools to improve bicycling and walking to school; and increasing funding for maintenance and repair of bicycle facilities.
Budget Town Hall meetings will be held at the following locations and times:
- GREAT FALLS: Monday, March 12 at 7:30 PM, Great Falls Library, 9830 Georgetown Pike
- PROVIDENCE: Wednesday, March 14 at 7:00 PM, Providence Community Center, 3001 Vaden Drive, Fairfax
- BRADDOCK: Wednesday, March 14 at 7:30 PM, location TBD.
- MASON: Thursday, March 15 at 7:00 PM, Mason District Governmental Center, 6507 Columbia Pike, Annandale
- MOUNT VERNON: Monday, March 19 at 7:00 PM, Whitman Middle School, 2500 Parkers Lane, Alexandria
- LEE: Wednesday, March 21 at 7:00 PM, Franconia Governmental Center, 6121 Franconia Road, Alexandria
- SPRINGFIELD: Thursday, March 22 at 7:00 PM, Springfield Governmental Center, 6140 Rolling Road, Springfield
Visit the County’s webpage on the proposed budget for more information. You can also contact your local district Supervisor to express your support for expanded funding for better bicycling. Find their contact information here.
Park E-Bike Policies Under Review
Electric bikes (E-Bikes) are growing in popularity and now park groups in Fairfax County are considering how best to manage the bikes use and safety on trails. The Northern Virginia Regional Park Authority and the Fairfax County Park Authority are considering whether to allow e-bikes on shared use park trails.
Shared-used trails in our parks are key transportation links so local jurisdictions are determining how best to accommodate e-bikes, while hopefully providing some consistency in the rules between jurisdictions. Currently under Virginia law, e-bikes are treated as bicycles if they have a maximum power of 1,000 watts, and a top speed of 25 mph. They’re subject to the same rules of the road as human-powered bicycles, and are allowed on sidewalks and paths where traditional bikes are allowed. However, shared use trails in our parks are subject to different rules, which currently prohibit motor vehicles on trails.

If you’re unfamiliar with e-bikes, they are bikes and trikes with an electric motor that can be used to assist the rider’s pedaling efforts. People for Bikes developed model legislation categorizing e-bikes into three classifications. The Class I pedal-assist bike has a motor that kicks on only when pedaling. Class II has a throttle and the motor engages on demand. Both of these types have a 750 watt motor that cuts out at 20 mph. There is also a Class III pedal assist that tops out at 28 mph.
The FABB Board is looking into the impact of the small yet growing numbers of e-bikes. E-bikes can help make the benefits of bicycling accessible to more people and encourage more trips by bike instead of a car. At the same time, we want to make sure increased e-bike use is safe on our trails. What do you think? Take FABB's quick survey on E-Bikes.
Distracted Driving Bill Moves in Virginia General Assembly
Distracted driving legislation was the one bicycling related bill to move in the Virginia General Assembly this year. The distracted driving legislation, HB181, states that the use of a cellphone that “substantially diverts the driver’s attention from the operation of the motor vehicle is guilty of distracted driving.” The bill would make distracted driving a primary motoring offense (a driver can be stopped solely for the offense) with fines of up to $500.
While HB181 passed the House, the bill was amended in the Senate to address concerns about the potential for racial profiling. The new language would require development of best practices and that law enforcement keep a record of citations. With the amended language, the bill passed the Senate, but is now in conference committee to reconcile the different versions of the legislation. Given the legislative session is over, time may have run out on the bill for this year.
Due to this increase in distracted-driving related deaths, bike advocacy groups, as well as AAA, Drive Smart Virginia, and police groups have called for revisions to Virginia’s distracted driving laws. According to The Virginian-Pilot, since 2012 as smart phones became more widely used, there have been 949 distracted driving-related fatalities in Virginia. This compares to 1,380 drivers who have been killed as a result of alcohol-related crashes during the same period.
I-66 Parallel Trail Update
While initial construction activities on the I-66 Outside the Beltway Project are set to begin, there are no new developments to report on the parallel bike trail. The contractor is working to finalize design plans for the trail as they complete engineering surveys of the corridor. Fairfax County DOT, meanwhile, is focusing on the off-corridor portions of the planned parallel trail, developing the scope of work documents and revising cost estimates. The good news is that the county will be able to begin the design process using existing funds. The bad news is that more money will be needed to complete the projects, and this funding must be identified and allocated. VDOT and FCDOT continue to assert that the entire I-66 parallel trail will be complete and open when the overall highway project is delivered.
Save the Date! Join Us at FABB's March and April Meetings
The March FABB meeting will be in Alexandria focusing on bicycling developments in the Lee and Mount Vernon Districts. Join us at 7:30 pm, Wednesday, March 21 at the Mount Vernon Government Center. We'll hear the latest updates from the Fairfax County bike program, Lee District Supervisor Jeff McKay's staff and, tentatively, Mount Vernon District Supervisor Dan Storck. This meeting is a great opportunity to get updates on projects such as the EMBARK Richmond Highway Project and raise concerns about bicycling and other multimodal transportation options in the district.
At the April meeting, FABB will provide an introduction to basic techniques and approaches for effective bicycle advocacy. If you've been contemplating becoming more involved in bicycle advocacy, this meeting can help jumpstart your participation. Join us at 7:30pm on Wednesday, April 18 at Patrick Henry Library in Vienna. Consider bringing a friend who may be interested in getting involved too!
Springfest Fairfax in April
Join FABB at Springfest 2018, Fairfax County’s annual Earth Day and Arbor Day event. This year’s FREE festival will be on April 21, from 10-4 pm at the Sully Historic Site. FABB is proud Springfest partner. Stop by FABB's table or join one of our social rides to the event. Stay tuned for more details. Interested in volunteering with FABB at Springfest? Sign up today!
Springfest 2018 will include workshops, exhibitors, and activities to help people take action to make a “Healthy Planet-Healthy People.” Activities include a petting zoo, an environmental obstacle course, and arts and crafts. You check out the bees and the trees exhibit, consult with Master Gardeners,and buy plants for your garden.
Join Us for National Bike Challenge
Are you ready for the challenge? After FABB's successful advocacy challenge last year as part of the National Bike Challenge, we're getting ready to do it again! Will you join us? Register today! Invite your friends and neighbors too! We're gearing up for the challenge which starts May 1st. The goal is get people out on their bikes to reap the benefits that come from an active, healthy, and fun means of recreation and transportation.
National Bike Summit A Success

The 2018 National Bike Summit wrapped up this week in Washington, D.C. Sponsored by the League of American Bicyclists, the Summit featured speakers, workshops and panel discussions on a variety of bicycle education and advocacy efforts around the country. FABB was represented by President Jeff Anderson, Vice President Sonya Breehey, and Reston advocate Mario Martin-Alciati.
U.S. Secretary of Transportation Elaine Chao opened the summit on Monday highlighting the administration's efforts to address bicycle safety, announcing the Federal Highway Administration's release of guidelines for Measureing Multi-Modal Network Connectivity, and touched on the Trump administration's infrastructure plan. Over the two days, there were workshops on developing e-bike policies, working with law enforcement, autonomous vehicles, bicycle friendly driver training, and many other topics. On Wednesday, FABB joined Bike Arlington, the Virginia Bicycling Federation and other advocates from around the state meeting with legislators on Capital Hill to advoacte for better bicycling in Virginia.
2018 FABB Planning, Volunteers Needed
FABB held two planning meetings in February to develop a 2018 work plan. The first meeting was among the Board members and the second involved a larger group of other key volunteers. In the first meeting, the board reviewed the organization’s overall objectives over the years and agreed to condense these into five priority areas. In the second meeting, the broader group of FABB volunteers broke into groups to develop goals, activities, and timelines for 2018 under each of the priority areas. The five priority areas are:
- Advocacy for Better Bicycle Infrastructure and Multimodal Transportation
- Bike Ridership and Education
- Alliances with Regional, Government, and Private Sector Partners
- Inclusive Outreach to All Fairfax County Communities
- Legal Rights for Cyclists
A board member was assigned to lead each priority area and will work with a broader team of volunteers to meet the objectives for each priority area. But, we need more help! If you would like to learn more about any of these priority areas or contribute to them in any way, please contact info@fabb-bikes.org.
Labels: bike to work day, budget, e-bikes, fabb newsletter, i-66, national bike summit, repaving, springfest
posted by Bruce Wright at 9:00 AM permalink
(0) comments
Thursday, March 1, 2018
Lee District Repaving/Restriping Meeting on March 7
The latest in the ongoing series of public meetings by the Virginia Department of Transportation (VDOT) and Fairfax County Department of Transportation (FCDOT) will focus on repaving and restriping plans for Lee District. It will be held on Wednesday, March 7, 2018, at 7:00 p.m. at the Franconia Governmental Center, 6121 Franconia Road, in Alexandria.
VDOT and FCDOT use the repaving and restriping process to implement Fairfax County’s Comprehensive Plan to improve traffic safety and provide more transportation options. Proposed striping changes in the Lee District include: bike lanes on Bland Street, Brandon Avenue and Lake Village Drive; striped parking lanes and shared lane markings (sharrows) on Castlewellan Drive and Fairchild Drive; buffered bike lanes, sharrows and a center turn lane on Frye Road; and sharrows and bike lanes on Buckman Road. Details on the proposed changes can be found here.
FABB encourages Lee District bicyclists to speak up at the meeting in support of the proposals and provide ideas to the VDOT and FCDOT planners for future restriping opportunities. If you can’t attend, you can still provide comments through March 23, 2018. Submit you comments on Lee District improvements here.
Labels: FCDOT, lee district, repaving, restriping, vdot
posted by Steve Ward at 5:58 AM permalink
(0) comments
Thursday, February 22, 2018
Dranesville Repaving Meeting is Tonight, Feb. 22
From our
earlier blog post: FABB is asking local bicyclists and other interested residents in the Dranesville District to attend the Virginia Department of Transportation (VDOT) and Fairfax County Department of Transportation (FCDOT) community meeting to discuss this year's
paving and restriping efforts in the Dranesville District. The meeting will be on Thursday, February 22, from 7:00 p.m. to 8:30 p.m. at the Franklin Sherman Elementary School Cafeteria, 6633 Brawner Street, in McLean.
Labels: dranesville district, repaving
posted by Bruce Wright at 3:03 PM permalink
(0) comments
Braddock and Providence Districts Repaving and Restriping Meeting Set for March 1
In their ongoing series of public meetings, the Virginia Department of Transportation (VDOT) and Fairfax County Department of Transportation (FCDOT) will host a repaving and restriping meeting for the Braddock and Providence Districts on Thursday, March 1, 2018. The meeting will be held at the Oak View Elementary School Cafeteria, 5004 Sideburn Road in Fairfax.
As you know VDOT and FCDOT use the repaving and restriping process to implement Fairfax County’s Comprehensive Plan to improve traffic safety and provide more transportation options. Proposed striping changes in the Braddock District
include road redesigns of Forum Road, Post Forest Drive and Ridgetop Road, as well as adding striped parking lanes, shared lane markings (sharrows), bike lanes and buffered bike lanes on Sideburn Road. Sadly, there are no striping changes planned in the Providence District in 2018. Details on the proposed changes can be found here.
This is a great opportunity for bike advocates to show up and speak up in support of the proposals and provide ideas to the VDOT and FCDOT planners for future restriping opportunities. If you can’t attend, you can still provide comments through March 16, 2018. Submit you comments for Braddock District here and for Providence District here.
Labels: Braddock District, providence district, repaving, restriping
posted by Steve Ward at 11:08 AM permalink
(1) comments
Tuesday, February 13, 2018
Dranesville Repaving and Restriping Meeting on February 22
FABB is asking local bicyclists and other interested residents in the Dranesville District to attend the Virginia Department of Transportation (VDOT) and Fairfax County Department of Transportation (FCDOT) community meeting to discuss this year's paving and restriping efforts in the Dranesville District. The meeting will be on Thursday, February 22, from 7:00 p.m. to 8:30 p.m. at the Franklin Sherman Elementary School Cafeteria, 6633 Brawner Street, in McLean.
Proposed striping changes in the Dranesville District include a bike lane and shared lane markings, also known as sharrows, on Beverly Road and Elm Street; striped parking lanes and sharrows on Fleetwood Road and Ingleside Avenue; and bike lanes, sharrows and striped parking lanes on Churchill Road. No existing on-street parking will be affected.
At the meeting, residents will have the opportunity to speak directly with road engineers and transportation planners about the paving program, proposed striping changes, and general traffic safety concerns. Information about paving and restriping in the Dranesville District will be on display in an open house format with a presentation starting at 7:15 p.m.
Community members are invited to give feedback on general traffic safety concerns regarding roads scheduled for repaving and the proposed striping changes at the meeting or by submitting comments online via the comment form on the paving and restriping program page. Comments will be accepted through March 9, 2018.
For more information on the 2018 Paving and Restriping Program, visit the FCDOT web page here. The Dranesville District information page includes maps, sample photos, the proposed list of roads being considered for paving and a link to the comment submission form.
See you there!
Labels: dranesville district, FCDOT, repaving, restriping, vdot
posted by Steve Ward at 7:26 PM permalink
(0) comments
Saturday, February 10, 2018
Springfield, Mt. Vernon, and Sully Repaving and Restriping Meetings Update
Last week’s postponed Virginia Department of Transportation (VDOT) and Fairfax County Department of Transportation (FCDOT) meeting on repaving and restriping in the Springfield District has been rescheduled for Thursday, April 5, 2018, at the West Springfield Government Center. The comment period has been extended until April 15.
Also, please remember that VDOT and FCDOT are hosting another community information meeting to discuss this year’s paving and restriping efforts in the Mount Vernon District this Monday, Feb. 12, from 7:00 to 8:30 p.m., in the Mount Vernon Governmental Center, 2511 Parkers Lane, Alexandria. Information about paving and restriping in the Mount Vernon District will be on display in an open house format with a presentation at 7:30 p.m.
Finally, Sully District community members can still give feedback through February 17 on general traffic safety concerns regarding roads scheduled for repaving and the proposed striping changes by submitting comments online.
Labels: FCDOT, mt. vernon district, repaving, restriping, springfield district, sully district, vdot
posted by Steve Ward at 2:24 PM permalink
(0) comments
Friday, February 2, 2018
Mount Vernon District Paving and Restriping Meeting, February 12
The Virginia Department of Transportation (VDOT) and Fairfax County Department of Transportation (FCDOT) will host another in the series of community information meeting to discuss this year’s paving and restriping efforts on Monday, February 12. This meeting will be on plans for the Mount Vernon District and will be held at the Mount Vernon Governmental Center, 2511 Parkers Lane in Alexandria starting at 7:00 p.m. Bicyclists and local residents will have the opportunity to speak directly with road engineers and transportation planners about the paving program, proposed striping changes, to include the addition of bicycle lanes and sharrows, and general traffic safety concerns. Information about paving and restriping in the Mount Vernon District will be on display in an open house format with a presentation at 7:30 p.m.

Portions of nearly 40 streets with be repaved with Furnace Road from Lorton Road to Route 1 and Hooes Road between Ox Road and the Fairfax County Parkway being two of the longest sections. A nearly three-mile long section of Pohick Road from Southrun Road to Rolling Road also will be repaved.
If unable to attend, community members are invited to give feedback on general traffic safety concerns regarding roads scheduled for paving, and the proposed striping changes by submitting comments online via the comment form on the paving and restriping program page here. Comments will be accepted through March 2, 2018.
Also, please mark you calendars to note that FABB's March monthly meeting on Wednesday, March 21, will be on Mount Vernon and Lee District bicycle developments and will be held at the Mount Vernon Governmental Center.
Labels: FCDOT, mt. vernon, repaving, restriping, vdot
posted by Steve Ward at 11:05 AM permalink
(0) comments
Tuesday, January 23, 2018
Sully District Repaving and Restriping Community Meeting
The Virginia Department of Transportation (VDOT) and Fairfax County Department of Transportation (FCDOT) will host a community information meeting to discuss this year’s paving and restriping efforts in the Sully District on Wednesday, Jan. 31, 7:00 to 8:30 p.m., in the Richard Frank Community Room of the Sully Governmental Center, 4900 Stonecroft Blvd, Chantilly.
VDOT has scheduled several roads in the Sully District for repaving starting in April and concluding in November 2018. This meeting will provide local bicyclists and other residents an opportunity to speak directly with road engineers and transportation planners about the repaving program, proposed striping changes and general traffic safety concerns.
This will be the only chance to do this in person in Sully District. FCDOT has informed us that this year’s repaving and restriping meetings will broadly review all of the plans for a specific district. So, only one meeting per district will be held rather than the multiple meetings for the numerous projects within a district that occurred in the past.
Please plan now to attend and provide input on the roads scheduled for repaving and the proposed striping changes, including the creation of bike lanes and sharrows. If unable to attend, you can submit comments online via the comment form on the paving and restriping program page. Comments will be accepted through February 17, 2018.
Labels: FCDOT, repaving, restriping, sully district, vdot
posted by Steve Ward at 8:00 AM permalink
(0) comments
Wednesday, September 27, 2017
Board of Supervisors Presentation on Bicycle Friendly Community Award
At their meeting yesterday the Fairfax County Board of Supervisors received their
Bicycle Friendly Community Bronze level award from the League of American Bicyclists. Congratulations to the Bicycle Program staff, the Board, and FABB members who worked with the county on their application. The county has made significant progress in the last couple of years, including 9.7 miles of bike lanes and 1.3 miles of buffered bike lanes as part of the
2017 repaving program.
We still have a long way to go to become a truly bicycle-friendly place. There are significant barriers to bike travel including the Beltway, I-66, I-95 and other major roads. Many businesses and retail establishments have no bike parking and what parking exists is often inadequate. See the
county's Report Card prepared by the League. Let's hope we can overcome some of these problems in the near future to reach the next BFC level.
 |
Front Row: Tom Biesiadny, Chris Wells, Adam Lind
Fairfax County DOT, Chairman Bulova, Nicole Wynands,
Fairfax Co DOT, and Sonya Breehey, FABB |
Labels: bicycle friendly community, repaving
posted by Bruce Wright at 2:20 PM permalink
(0) comments
Tuesday, August 8, 2017
New Bike Lanes in Reston
 |
| New North Shore Dr Bike Lane in Reston |
VDOT is finishing the repaving of North Shore Drive in Reston. New bike lanes are included in the project. In most sections a bike lane is located on one side of the road and Shared Lane Markings or Sharrows are located on the other side. See the
map of proposed options.
Other repaving projects in Reston still to be completed this summer are Twin Branches Road, Glade Drive, and Colts Neck Road, all located south of the Dulles Toll Road.
See the Hunter Mill repaving projects page for details.
These new bike lane projects are well-timed as the county is proposing to add bikeshare stations south of the Toll Road (
map of proposed stations). Currently all bikeshare stations are located north of the Toll Road. You can
provide feedback on future station locations.
 |
Sharrow on North Shore Drive. Bike lane on opposite side. |
Labels: bike lanes, north shore drive, repaving, reston
posted by Bruce Wright at 3:21 PM permalink
(0) comments
Thursday, April 20, 2017
Public Meeting on Glade Drive Design Improvements Next Thursday
 |
Map courtesy of FCDOT.
|
The purpose of the meeting will be to gather community input on various proposals to improve traffic safety, bicycling and the pedestrian environment on Glade Drive during the scheduled repaving this summer by the Virginia Department of Transportation's (VDOT). In particular, there will be a discussion of new bike lanes and sharrows that have been proposed for Glade Drive from Glade Bank Way to Twin Branches Road.
There will be an open house at 6:30 p.m., and then representatives from FCDOT and VDOT will present plans for the project, which includes sharrows/shared lane markings, bike lanes, crosswalks and pedestrian improvements, starting at 7 p.m. Hope to see you there.
Labels: FCDOT, glade drive, repaving, reston, vdot
posted by Steve Ward at 3:43 PM permalink
(0) comments
Monday, April 3, 2017
Meeting Wed. on Proposed Bike Facilities on Woodford Road
On Wed. April 5 Fairfax County is holding a meeting to discuss
proposed bike facilities on Woodford Road. The meeting will be held from 6:30 to 7:30 p.m., in the cafeteria of Kilmer Middle School, 8100 Wolftrap Road, Vienna. Woodford is a primary access road into Tysons.
Cyclists are encouraged to attend the meeting to learn more about the project, provide feedback, and support the county's efforts to make Tysons a more bike-friendly place.
Labels: repaving, Tysons, woodford road
posted by Bruce Wright at 3:59 PM permalink
(0) comments
Tuesday, March 21, 2017
Lee District Repaving Meeting, 28 March
Local FABB members are encouraged to make their voices heard at a Fairfax County Department of Transportation (FCDOT) community meeting to discuss proposed bicycle improvements in the Lee District on Tuesday, March 28, from 6:30-8:30 p.m. in the cafeteria of Crestwood Elementary School, 6010 Hanover Avenue in Springfield. The following areas in the Lee District are under review for the Virginia Department of Transportation's (VDOT) 2017 repaving schedule:
-- Commerce Street from Old Keene Mill Road to Franconia Road
-- Loisdale Road from Franconia Road to Spring Mill Drive
This will be an excellent opportunity to give feedback to VDOT and FCDOT on traffic safety, bicycling, pedestrian, and related concerns in the Lee District.
Labels: FCDOT, lee district, repaving, vdot
posted by Steve Ward at 6:30 AM permalink
(0) comments
Monday, March 20, 2017
What You Missed – FCDOT Progress Report
Last Wednesday at FABB’s March meeting Adam Lind of FCDOT provided an update of ongoing repaving, capital projects, studies and other developments related to bicycling in Fairfax County.
2017 Repaving: 21 miles of bike lanes and sharrows will be added this year in Reston and the Dranesville and Lee Districts. Meetings on Dranesville and Lee repaving will be held on 23 March and 28 March respectively. Details are available on the FCDOT website.
Capital Projects: Bike lanes and shared used paths for Route 1, Lorton Road Extension, and Workhouse Arts Road, which includes a trail that connects to the Cross-County Trail, are almost complete.
Studies: The Little River Turnpike study is complete and will be going to the Board of Supervisors for endorsement. The Cinderbed study for a trail linking the Franconia-Springfield Metro to the Fairfax County Parkway Trail is done and the determination of project phasing is underway. Studies are underway for the Fairfax County Parkway Trail at the Dulles Toll Road, the Monroe Street Bridge over Rt. 267, and neighborhood connections to north side of Innovation Station.
Bikeshare: Twelve stations have been installed in Reston and the remaining three stations should be installed by the end of April. Eleven stations have been installed in Tysons with one more under construction and two more planned to start once locations are finalized. FCDOT is moving forward on trying to acquire TAP funding for ten new stations in Reston to expand the network south of the Dulles Toll Road.
Fairfax County Bike Map: A new map is being finalized with anticipated distribution during the first week of May. The map features routes that show levels of stress and has on-road and off-road routes.
Bicycle Wayfinding: Signs are ready for installation and should be installed by the end of April in Franconia-Springfield, Vienna Metro area, and East Falls Church-Annandale. Mile markers are being added to the Fairfax County Parkway Trail. Design of signs has started for the Fairfax County Parkway Trail and for Tysons-McLean area.
Outreach: FCDOT now has a consultant to assist with campaigns to promote safety, the bike parking program, and responsible use of bike facilities. Tentative plans are underway to conduct bike rides to tour new infrastructure.
The next FABB monthly meeting will be in Falls Church on Wednesday, 19 April, in the Dogwood Room, City Hall, 300 Park Ave. Hope you can join us.
Labels: bike map, capital projects, FCDOT, outreach, repaving, studies, wayfinding
posted by Steve Ward at 6:00 AM permalink
(0) comments
Friday, March 17, 2017
Support Needed for Reston Bike Projects
Cyclists are needed to
contact the county bike program by March 31 to support
new bike projects in Reston. At a meeting last night several local residents spoke out strongly against proposed bike lanes on Colts Neck Road and North Shore Drive. There were minor concerns about the project on Twin Branches Road.
When the Lawyers Road and Soapstone Drive road diet projects were proposed, the same arguments were used against those roads. On Lawyers Road there was almost no impact on traffic throughput while at the same time crashes were deducted by over 60% during the 5 years since project completion.
The most vocal opposition was against the road diet project on Colts Neck Road. During repaving of the road this summer Fairfax Co is proposing to reduce the regular travel lanes from two in each direction to one lane in each direction with bike lanes. Current traffic volume is well below the recommended level for implementing a road diet and less than the volume on the successful Lawyers Road project. The Colts Neck project will provide dedicated bike facilities and a safer road for everyone, including the many pedestrians in that area who regularly cross to access the shopping center on the east side.
Please
contact the Fairfax County bike program by March 31 with your supportive comments:
I strongly support the bike projects on Colts Neck Road, North Shore Drive, and Twin Branches Road will make those roads safer for all users while providing much needed bike facilities. The road diet on Colts Neck Road, where many cyclists currently ride, is especially important.
Byclists will have dedicated space on Colts Neck and pedestrians crossing the road will be safer, having to only cross one lane in each direction rather than two. Speeds should be reduced as well. When the Reston Town Center Metro station opens, Colts Neck will be a major bike route to that station. The bike lanes on Colts Neck will connect to the planned cycletrack on Sunrise Valley Dr. and connect to the many developments planned along Sunrise Valley Dr.
Labels: colts neck road, north shore drive, repaving, road diet, twin branches road
posted by Bruce Wright at 9:08 AM permalink
(0) comments
Wednesday, March 15, 2017
Dranesville Bike Improvements Meeting on March 23
 |
Lewisville Road (photo courtesy of InsideNoVa.com) |
Dranesville Supervisor John Foust is hosting a community meeting with the Fairfax County Department of Transportation (FCDOT) to discuss proposed bicycle improvements in the Dranesville District. The meeting will be on Thursday, March 23, from 6:30 p.m. to 8:30 p.m. in the Churchill Road Elementary School Cafeteria, 7100 Churchill Road, McLean. Proposals include adding bike lanes to Lewinsville Road from Titania Lane to Fallstaff Road (eastern intersection) and Chain Bridge Road from Great Falls Street to Westmoreland Street.
As always, your support and feedback are needed to make sure these improvements happen.
Labels: dranesville district, FCDOT, repaving
posted by Steve Ward at 7:00 AM permalink
(0) comments