Monday, July 23, 2007
Bicycle crossings needed in Beltway HOT Lanes project
VDOT and a private contractor are in the midst of negotiating the final details of the Beltway HOT Lanes project. In May of this year FABB sent a letter to Transportation Secretary Pierce Homer expressing our concerns about the lack of bike facilities as part of the project. On June 1, 2007 WABA sent an alert with similar information, asking Virginia cyclists to contact VDOT and the County Board. Thanks to the many cyclists who sent letters of support.In Secretary Homer's response he states that: “VDOT understands the importance of integrating bicycle and pedestrian facilities into the project, and is currently evaluating several design alternatives that include bicycle and pedestrian facilities.” We would like to see these plans.
Since that time little information has been forthcoming from VDOT about the project. We met with an engineer who said that bicycle facilities would be very expensive, and that VDOT and the contractor, Fluor/Transurban are negotiating what will be included in the project.
We are concerned that final plans are being developed with little or no public input. VDOT will likely hold public hearings soon. Meeting are being held this week on the 95/395 HOT lanes project. From what we can tell, the meetings were announced on July 18, less than a week before the first meeting, which is being held tonight.
Cyclists must be prepared for the Beltway HOT lanes public hearings. Information about the project is available on the VDOT web site. Documents related to the project are on the contractor sponsored site, virginiahotlanes.com. The Documents and Resources page contains links to the Final Environmental Impact Statement, April 2006 [Warning: Large pdf; to view download and view locally], among others.
In the Final EIS VDOT claims that “The Existing Trails Map and Countywide Trails Plan [Also large pdf files] were reviewed to ensure that none of the existing or PLANNED trails within the study area would be affected by the project.” From what we've seen, this is not true. No bike lanes will be built as part of the project and the bridges will likely not be wide enough to accommodate them in the future, and yet bike lanes and major trails are planned on several of the crossings.
Delegate James Almand, 47th District, agrees that bike facilities should be part of the project. The Final EIS contains a letter from him (p. A-27) that states in part: "I would support inclusion of separate protected bikeways along the Beltway and safe bike crossings built into construction plans. I would also support walking/running trails to be placed alongside, separate from the bike trails."
As we receive more information about this project we will pass it on.
Update July 25, 2007: Congressman James Oberstar, Chairman of the House Transportation and Infrastructure Committee, does not have a high opinion of public private partnership agreements for building highways. From a May 10, 2007 open letter from him and Congressman DeFazio, also of the Transportation Committee: "We write to strongly discourage you from entering into public-private partnership ("PPP") agreements that are not in the long-term public interest in a safe, integrated national transportation system that can meet the needs of the 21st Century...The Committee will work to undo any state PPP agreements that do not fully protect the public interest and the integrity of the national system."
Update 2 July 25, 2007: On June 5, 2006 the Fairfax County Board of Supervisors sent a letter to Secretary of Transportation Pierce Homer in support of including bike/ped crossings on ALL of the existing crossings of the Beltway as part of the HOT lanes project. They said: "Because the Capital Beltway currently acts as a barrier to non-motorized transportation options, pedestrians and bicycles must be accommodated at all crossings of the Beltway, and connections to adjacent existing and planned trails need to be completed as part of the project."
Update 3 July 25, 2007: On June 7, 2007 Providence District Supervisor Linda Smyth held a seminar on the HOT lanes projects. VDOT and Fluor/Transurban staff discussed the project and answered questions. If it's a really slow night and you want to learn more about the project, check out the video of the seminar on YouTube. The question and answer session begins about 57 minutes into the session.
With the information above and more information expected to be posted soon, we'll try to put together a separate FABB HOT lanes information page in the near future.
Monday, April 28, 2008
HOT lanes plans available for public review
As mentioned in an earlier blog entry, the Beltway HOT lanes project public hearings will be held on May 20 & 21. One month before the hearings the current plans for the project must be available to the public for review. We recently rode to the VDOT headquarters, a not very bike-friendly location, to look at the plans. FABB's position has been that VDOT and the HOT lanes contractors Fluor and Transurban should follow the guidelines in the Fairfax County Comprehensive Trails Plan for all reconstructed bridges over the HOT lanes.We've posted copies of some of the plans online. From our initial review, it appears that most of the Trails Plan facilities are included in the project plans. A summary table of the VDOT and Fairfax Co DOT agreement on bike/ped facilities lists the Trails Plan requirements, the HOT lane team proposals, and the County recommendations, most of which match the Trails Plan. The key text in the document is the last entry, footnote 4: “VDOT concurs with the FCDOT Staff Recommendation.”
There are still some outstanding issues:
- Leesburg Pike - Route 7—While we are quite sure that multiuse trails will be included on both sides of the bridge, we do not have a copy of those plans.
- Gallows Road—The planned bike lanes on Gallows Rd do not appear to be included in the plans. Gallows Rd is a major bike commuter route. It is one of the few roads in the county for which funds are available for building bike lanes. It's critical that bike lanes be included on this road.
- Wakefield bike/ped bridges—This bridge near Wakefield Park is currently 8 feet wide. The new bridge will not be any wider. It should be the same width as the W&OD Trail bridge, 16 feet. At a minimum it needs to be 10 feet, VDOTs standard for a multiuse trail.
See the FABB HOT Lanes Summary Page for more in formation.
Monday, April 21, 2008
Support bike facilities on Beltway HOT Lanes bridges
Now is the time to speak out for bike facilities on the Beltway HOT Lanes bridges. The Beltway has been a barrier to bicycle travel in Northern Virginia for over 40 years and now is the time to overcome that barrier. Public hearings on the proposed Beltway/I-495 High Occupancy Toll (HOT) project were just announced.There will be hearings on two evenings, Tues. May 20 & Wed. May 21. An open house will be held from 5-7 p.m. After a brief presentation at 7 p.m. there will be a public comment period. Arrive early to sign up for the speaker's list at the door.
- May 20, Tuesday, Northern Virginia Community College Ernst Cultural Center, 8333 Little River Turnpike, Annandale, VA 22003.
- May 21, Wednesday, Marshall High School, 7731 Leesburg Pike, Falls Church, VA 22043
- This is a once in a lifetime opportunity to provide bicycle connections across the Beltway which has been a barrier to bicycle travel for 40 years.
- The bicycle facilities on the Fairfax County Trails Plan need to be on the plans for all bridges and overpasses, including bike lanes and multi-use trails where appropriate. See the McLean Citizens Association resolution for more info.
Other resources:
- VDOT HOT lanes project page
- Earlier FABB HOT lanes blog entry
- Later FABB blog entry on announcement of a final deal with VDOT
- Our letter to the Washington Post “With HOT Lanes Must Come Bike Lanes”
Friday, December 21, 2007
HOT Lanes project deal signed
According the Washington Post article Deals Clinched on HOT Lanes, “Virginia transportation officials announced late Thursday that they have finalized all the agreements needed to start construction in the spring on a $1.4 billion project to add HOT lanes on a 14-mile stretch of the Capital Beltway.” We have been working with Fairfax County to try to ensure that bicycle facilities, as outlined on the County Trails Plan, will be included in the project. VDOT and the County have been meeting to discuss proposed facilities and it sounds like many will be included.We are still very concerned about the lack of information being provided to the public. We have not officially seen any plans for the HOT lanes bridges. From the VDOT press release issued yesterday, it will be VDOT's responsibility to rebuild the bridges over the Beltway. VDOT will:
Provide a $409 million financial grant to the project to support the construction of key elements including the final phase of the Springfield Interchange (Phase VIII), improvements to the I-66 interchange, participation in the regional congestion management plan and reconstruction of aging bridges on the Beltway.It will be critical that bicyclists attend the public hearing this spring to speak out for bike facilities on the HOT lanes bridges. There won't be another chance in our lifetimes. VDOT is required to provide information to the public one month before the hearing. As soon as that information is available we will get the word out. To learn more about the project visit either the VDOT project page or the Fluor and Transurban project page, VirginiaHOTlanes.com
Saturday, October 27, 2007
With HOT Lanes Must Come Bike Lanes
We recently sent a letter to the editor of the Washington Post about an article they published on the I-495 HOT lanes project. The letter was expanded into an article published in the Sunday Outlook section on page B8, With HOT Lanes Must Come Bike Lanes. As we stated in the article, bicycle facilities as required by the Fairfax County Trails Plan [large pdf file] must be included in the project. For too long the Beltway has been a major barrier to bicycle travel. Now is the time to overcome that barrier by including bike lanes on some of the bridges, and on others, dual multi-use trails. These bridges over the Beltway will be rebuilt as part of the project, and we can't wait another 40 or 50 years for another chance for these facilities to be built.Thursday, June 10, 2010
Cyclists speak out for bike facilities on HOT lanes bridges
At the HOT lanes meeting last night several cyclists spoke in support of including bike facilities on the Old Dominion and Georgetown Pike bridges across the Beltway as part of the extension of the HOT lanes project. The bridges will be rebuilt if the extension is approved.The cyclists may not support the HOT lanes extension, but if the project goes forward, this is the only chance for the next 50-60 years for including bike facilities on those bridges. It's consistent with the VDOT Policy for Integrating Bicycle and Pedestrian Accommodations, with the new FHWA Policy Statement on Bicycle and Pedestrian Accommodations, and it's the right thing to do.
It was important to show your support. Others in attendance belittled the idea of people actually wanting to bike in that area. Thanks to everyone who came to the meeting.
Labels: hot lanes
Thursday, May 22, 2008
Cyclists speak out for bike facilities at HOT lanes hearings
Over half of the speakers at last night's public hearing on the Beltway HOT lanes project spoke out for including bicycle facilities on the HOT lanes bridges that will be reconstructed as part of the project. Dranesville Supervisor Foust noted that the project is a once in a generation opportunity to provide bicycle and pedestrian access across the Beltway, which has been a barrier to bicycle travel since the late 1960's.WABA president Douglas Stewart and I both noted the importance of including on-road facilities on the bridges. Others pointed out that Route 7 has no on-road facilities and the off-road sidepaths, while providing access over the bridge, will be dangerous given the high speed traffic entering and exiting the HOT lanes and the Beltway. We think the message was clear; citizens demand transportation alternatives, including bicycle facilities on all our roads.
VDOT and Fairfax County have agreed to a number of bicycle accommodations (see Exhibit N, Attachment 3-1A), and displays showing these facilities were posted at the open house before the public hearing. We will continue to monitor this project to ensure that the bike facilities remain a part of the project.
Wednesday, February 11, 2009
I-95/395 HOT lanes public hearings
We attended one of the I-95/395 HOT lanes public hearings held last night in Springfield. As we noted in our earlier post, we were most concerned about the ped/bike bridge used by many commuters to cross I-95 near the Springfield Metro station and Springfield Mall.The bridge is being torn down to make way for exit/entrance ramps for the new HOT lanes. In order to replace the ped/bike bridge in the original location, it would need to be twice as high as the existing bridge to clear the proposed ramps. Instead, the new 10-foot wide ped/bike bridge will extend along I-95 to the Franconia-Springfield Parkway ramp, extend parallel to the ramp, then cross at grade across approximately 6 lanes of potentially high-speed traffic. It will then descend to the west side of I-95 where it will make a big loop, which we are told is required to meet ADA requirements. To see a detailed image, click on the image above.
The new bridge will be dangerous for users and could take twice as long to cross. Users will be required to activate a pedestrian signal, wait for the signal to change, then pray that motorists actually stop, especially those using the southbound ramp. This is a major degradation in service for trail users.
Please send comments to the project team by February 21 to ask for an equivalent replacement to the existing bridge:
- The new bridge will be much more dangerous for all users.
- The replacement bridge should provide equivalent access as the original bridge.
- The new bridge should provide a grade-separated crossing of I-95 and not require crossing of multiple exit/entrance lanes.
You can review the plans and make comments at the final public hearing tonight from 5-9pm at:
Minnie Howard School
3801 W Braddock Road, Alexandria, VA 22302
Public hearing flier.
Monday, November 19, 2007
MCA HOT Lanes Resolution
The McLean Citizens Association thinks there should be better bicycle and pedestrian facilities on the planned HOT lanes bridges. They passed a resolution that states that VDOT and the private contractor should build the facilities indicated on the Fairfax County Trails Plan, which includes mutli-use trails and bike lanes on several bridges. Read the Sun Gazette article about the HOT lanes resolution.Let the Fairfax County Board of Supervisors know that now is the time to overcome that barrier by providing adequate bicycle facilities on the bridges. VDOT should follow the Trails Plan that shows on-road bike routes on four of the bridges, and dual multi-use trails on several others. Contact Chairman Connolly and other Board members
Monday, June 7, 2010
Meeting to discuss HOT lanes extension - speak out for bike facilities
Supervisor Foust and Delegate Comstock are hosting a HOT lanes meeting on Wednesday, June 9 at 7:30 pm at the McLean Community Center, 1234 Ingleside Avenue, McLean to discuss extending the HOT lanes north toward the American Legion bridge. As part of the project, both the Old Dominion and Georgetown Pike Bridges would be replaced. Bike facilities are included in the early plans for these bridges. According to the Trails Plan, the Old Dominion bridge should have bike lanes and a major paved trail on the N side. On the Georgetown Pike bridge, a minor paved trail is indicated on the south side and either a major paved or stonedust trail on the north.There is some local opposition to the bike facilities. While Supervisor Foust supports these facilities, cyclists need to attend the meeting to speak out in support as well. For more information please contact: Cheryl Patten in the Dranesville District office at (703) 256-0551, or Elise Marsh in Delegate Comstock's office at (703) 209-3787.
Sunday, January 3, 2010
January-February FABB newsletter
Our latest newsletter is now available online. It includes a short recap of major bicycle-related events that occurred in Fairfax County in 2009:- Tysons Bike Plan (pdf) - FABB presented the draft Tysons Bike Plan to the Fairfax County Planning Commission's Tysons Corner Committee.
- Lawyers Road Bike Lanes - The first ever bike lanes in Reston were installed on a section of Lawyers Road.
- Gallows Road Bike Lanes - Bike lanes were striped from the I-66 bridge at Dunn Loring north to the W&OD Trail.
- Grant from Alliance for Biking and Walking - FABB received a grant of $9,600 from Alliance for Biking and Walking to develop a handbook for non-engineer bicycle advocates for use during the design of new bicycle facilities.
- Bike Valet at Reston Festival - Approximately 125 people parked their bikes at bike valet parking provided by FABB at the Reston Festival on July 11 & 12.
- VDOT Funding for HOT Lanes Bike/Ped Facilities (pdf) - VDOT received $500K to build connections from the HOT Lanes project limits to existing sidewalks and trails.
- Bike Light Giveaway - FABB installed approximately 150 sets of lights.
Labels: fabb newsletter
Friday, October 12, 2012
New bike lanes on Westpark Dr in Tysons
As part of the 495 Express Lanes (aka HOT lanes) project, the bridge on Westpark Dr over Route 123, that leads from Tysons Corner Center to Galleria Dr, was rebuilt. The bridge now has bike lanes and wide sidewalks giving cyclists and pedestrians much better access in that area.We discovered the new bike lanes today after teaching a bike maintenance class at PwC, a major employer located on Tysons Blvd., within sight of the Westpark bridge. Our contact there uses the bridge on her commute to work and she pointed out the new lanes. We knew they were planned but they hadn't been stripped the last time we rode there.
| Westpark Dr. bike lanes |
As you can see from the photo on the left, there is a transition from the sidepath to the bike lane. This is on the north side. I didn't see any transition for those cyclists on the south side approaching the sidepath from the other direction. I assume they would cross at the crosswalk and somehow enter the trail.
Unfortunately the trail comes to an abrupt end not far away. It is planned to extend all the way to the bike lanes adjacent to the Towers Crescent (Shopping Bag) building, but probably not until there is more construction on the mixed use development planned for this area.
| Sidepath on Tysons Ring Road |
Labels: 495 express lanes, Tysons, westpark bridge
Monday, October 8, 2012
Major paved trail on Route 7 bridge across Beltway
| New Route 7 wide sidewalk across Betlway |
This bridge has never had adequate pedestrian facilities, much less bike facilities. As I recall, there was a very narrow concrete ledge that some people used to walk across the bridge. Those cyclists who dared to try to cross, rode in the travel lanes, with high speed exit and entrance ramps onto the Beltway. One reason that FABB started doing bike light giveaways was after a cyclists was killed while riding across the Beltway on Route 7 in Tysons.
Since 2007 a major goal of FABB has been to ensure that bike facilities are included on the bridges across the Beltway. Most Beltway bridges between I-95 and the American Legion Bridge were reconstructed as part of the HOT lanes project, now called the 495 Express Lanes. See the many blog postings on our HOT lanes advocacy. We attended public meetings, wrote a Post Outlook section article, and met with county and VDOT staff to ask that the facilities that are indicated on the county Trails Plan be included in the project.
With support from county DOT and VDOT, those facilities are close to becoming a reality. While they are far from perfect, in most cases they provide the first accommodations for pedestrians and cyclists on the Beltway bridges. As you can see from the photo above, there is still some work to be done but we expect the facilities to be open in the near future.
| Trail over Beltway on Route 7 ends at exit ramp |
Labels: 495 express lanes, hot lanes, route 7
Tuesday, November 6, 2012
November-December FABB Newsletter
NOVEMBER-DECEMBER 2012 FABB News
A bi-monthly publication of Fairfax Advocates for Better Bicycling
Outstanding * A Milestone * Superb Speakers * Engaged Audience * Passion
These are some of the words people who attended our first Fairfax Bicycle Summit used during and after the October 27 event. FABB collaborated with Fairfax County Department of Transportation (FCDOT) and George Mason University to put together a stellar list of speakers and local bike shops, who inspired us to redouble our efforts to make bicycling an everyday activity for the good of our communities. We heard of at least two people who visited local bike shops after the summit, looking for bikes to use for local trips.
Keynote speaker Andy Clarke, President of the League of American Bicyclists, stated the obvious: Fairfax faces many challenges for bicyclists. But he also noted that things are changing for the better. Fixing some of the challenges does not necessarily involve any grandiose ideas, specialized infrastructure, or millions of dollars. For example, simple actions such as closing gaps in our sidewalks and trails and keeping walking and bicycling paths clear of snow and debris would improve conditions for bicyclists. Although encouraging bicycling is not “rocket science” and many people want to drive less, commitment from the top is required because change does not happen by chance. Speaker Tom Biesiadny, Director of FCDOT, detailed ways that his department is working to further bicycle transportation, such as completing the county bicycle master plan, partnering with VDOT to add wide shoulders or bike lanes during road repaving projects, and conducting a trails and sidewalk condition assessment.
As the day progressed, speaker after speaker detailed ways we can bring better and safer conditions to cyclists. The more people who ride, the safer everyone is. Ideas were wide ranging: bike stations for residential tenants in redeveloped Tysons Corner, road diets that incorporate bike lanes, kids telling their peers how much they enjoy biking to school, bike sharing, enticing recreational bikers to try riding for short trips around town, convincing people that riding 2 miles to the store doesn’t mean you need to be an endurance athlete. Closing speaker Stewart Schwartz of Coalition for Smarter Growth pointed out that bicycling makes sense in terms of energy, economics, health, and competitive growth, and biking for transportation truly contributes to our national security.
FABB presented awards to Fairfax County Bicycle Coordinator Charlie Strunk and VDOT Traffic Engineer Randy Dittberner for their work on behalf of bicyclists; both are avid transportation cyclists.
We already are tossing around ideas for our next bicycle summit, although topping this year’s program will be tough. If you missed the inaugural event, be sure to attend the next one!
Draft Bicycle Master Plan
Toole Design Group delivered the final draft of the Fairfax Countywide Bicycle Master Plan County Bike Coordinator Charlie Strunk. Staff briefed the Planning Commission on the bike plan on October 17. Meetings are currently being scheduled with staff from the Department of Planning and Zoning and the Department of Transportation's Long Range Planning Section in order to review format and comprehensive plan language compatibility. The draft-final plan will be presented to the Planning Commission after the first of the year to seek approval of the Plan. It will then go to the County Board of Supervisors for their approval. Once a copy of the Plan is available we will post information on the FABB website.
Safe Routes to School in Fairfax
Over the past 3 years, FABB has been working with both Fairfax County government and the Fairfax County Public Schools, encouraging them to embrace a system-wide effort to get more children to walk and bike to school. Leveraging the National Safe Routes to School (SRTS) program, Jeff Anderson has been leading the charge for FABB and recently brought national exposure to Fairfax. In May, WAMU's Metro Connection interviewed Jeff and two of his three children for the feature From A To B: Families Try To Bring Back Walking, Biking To School, which ran on NPR. In June, Nike sent a photographer to capture the Wolftrap ES Bike Train as part of a larger report, Designed to Move: A Physical Activity Action Agenda. The SRTS section of the report (page 78) contains a photo of Wolfie's bike train. Bicycling magazine published a report on biking to school and included a picture of the Anderson peloton as representative of kids who can and do bike to school (section 7). In August, Wolfie's Bike Train was featured in the article Uphill Ride: Kids and Their Parents Show the Way to Cycle Safely to School in Landscape Architecture magazine.
Finally, in September, Nickelodeon sent two film crews to Wolftrap ES to film the bike train and to profile Carina Anderson (6th grader at Wolftrap ES) as part of their 30 min special on I Play Because... The kids at Wolftrap ES are setting a great example for others.
FABB will continue to push for continued movement within Fairfax County to get more kids to bike and walk to school as these children are the bike commuters of tomorrow.
Bicycle Bills in 2013 Virginia Legislative Session
Delegate Alfonso Lopez (49th District) plans to reintroduce the "Exercise due care" and "Following too closely" bills again in the 2013 session. Both bills would help educate motorists about the rights of bicyclists and the need for motorists to drive carefully around them. These bills were opposed last year by Northern Virginia Delegate Barbara Comstock (34th District), who cast deciding votes in defeating them. Once the and other bike-related bills are introduced we will ask cyclists to contact their local legislators to urge them to support the bills.
First Bike Sharing System Implemented at GMU
GMU recently implemented a bike sharing system at four "stations" around campus.
Patriot Bikeshare uses bikes from viaCycle. The system is very simple. The bikes are parked at designated bike racks using an attached cable locking system. There are a couple of options for using the system:
- One-time $3 fee to check out a bike for a 12 hour time period.
- Subscription fee of $6/month available to Mason students, faculty, or staff.
New Bike/Ped Staff Person at Fairfax County
Fairfax County DOT recently hired a new bicycle (and pedestrian) staff person to work in the county bike program. Her name is Vanessa Aguayo. According to the county bike coordinator, "She has an engineering background, comes to us from the private sector, and has lots of experience in designing bike and pedestrian projects as well as traffic calming." Welcome to Vanessa; we look forward to working with her.
VDOT Releases Updated Bicycling in Virginia map
VDOT recently released an updated version of the state bike map, Bicycling in Virginia. The map shows major bike routes in the Commonwealth, including United States Bicycle Routes (USBR) 1 & 76, Skyline Drive, Blue Ridge Parkway, the Virginia Capital Trail, and a few other major trails. There is a Northern Virginia inset showing details of USBR 1, the Fairfax Co Parkway Trail, the Cross County Trail and others.
495 Express Lane Bridges Now Have Bike/Ped Facilities
The 495 Express Lanes are scheduled to open on November 17 . Since 2007 a major goal of FABB has been to ensure that bike facilities are included on the bridges across the Beltway. Most Beltway bridges between I-95 and the American Legion Bridge were reconstructed as part of the HOT lanes project (now called the 495 Express Lanes). See the many blog postings on our HOT lanes advocacy. We attended public meetings, wrote a Post Outlook section article, and met with county and VDOT staff to ask that the facilities that are indicated on the county Trails Plan be included in the project.
With support from Fairfax County DOT and VDOT, those facilities are a reality. While they are far from perfect, in most cases they provide the first accommodations for pedestrians and cyclists on the Beltway bridges. The next step is to ensure that those new facilities are connected to the surrounding bicycle route network.
FABB Fact: 31% of trips in central Fairfax are less than 3 miles.
Events - For full details see the FABB Events Page.
Wednesday, November 21 - No FABB meeting in November
Thursday, December 13 - WABA Holiday Party
Wednesday, December 19, 7:30pm - FABB monthly meeting
FABB BLOG - For other news and articles of interest, visit the FABB blog.
Fairfax Advocates for Better Bicycling is a grassroots initiative, affiliated with the Washington Area Bicyclist Association, aiming to make bicycling an integral part of Fairfax County's transportation network. Visit us on the web, Facebook, and Twitter. Donations to FABB are tax-deductible and help us further our bicycling goals in Fairfax.
Labels: fabb newsletter, fairfax bike summit, november-december
Wednesday, November 14, 2007
VDOT Six Year Program public hearings
FABB attended the VDOT Six Year Program hearings held on Tuesday, November 13, 2007 at the Fairfax County Government Center. We testified before the Secretary of Transportation, Pierce Homer, and the Commonwealth Transportation Board members about the need for better bicycle facilities on Virginia roads. While we commended VDOT on the new policy for using 2% of road maintenance for paving shoulders and for the on-road bike facility on Stringfellow Road, we noted several areas of concern.Fairfax County has requested VDOT to restripe Gallows Road to create bike lanes from the Dunn Loring Metro station to Gallows Branch Rd. in Tysons. Funding has been available for several years and yet VDOT has found many reason for NOT installing the lanes, and their cost estimate for just the design for the work is much too high. We asked that VDOT “...have a more cooperative and flexible attitude when it comes to retrofitting existing roads with bike lanes.”
We mentioned the need for bike facilities on the bridges over the Beltway that will be re-built as part of the HOT lanes project. We also discussed the idea of dedicated funds for maintenance of bike facilities; trails, bike lanes, and road shoulders. See the full FABB testimony.
More than half of the speakers discussed bicycle and pedestrian issues in Northern Virginia. Among the speakers was Allen Muchnick of the Virginia Bicycling Federation who discussed the “Virginia Bicycling Federation Proposals For Effective VDOT Bicycle And Pedestrian Programs At The Statewide And District Levels” as described at the bottom of the VBF home page. Stewart Schwartz of the Coalition for Smarter Growth mentioned the need for a more bicycle- and pedestrian-friendly Route 7 and Route 123 in Tysons. Roger Deitrich of the Sierra Club noted the need for more transit-oriented development which facilitates bicycle- and pedestrian-friendly communities.
See the VDOT News Release about the meetings. Public comments will be accepted until November 22, 2007 at Six-YearProgram@VDOT.Virginia.gov.
Tuesday, October 26, 2010
FABB receives grant for bike light giveaway, bike racks, and bike commuting seminars
Today FABB learned that we received funding from Transurban, one of the companies involved with building the HOT lanes project, for bike light giveaways, purchase and installation of bike racks, and funds for conducting bike commuting seminars.Last year FABB received a grant from Transurban for our first bike light giveaways. Many people depend on bicycles for transportation and must ride at night. Providing front and rear lights helps ensure they will be visible and safe. Last year we installed approximately 160 sets of lights at four bike light giveaways.
This year FABB again applied for funds to purchase lights. We expanded our application to include funds for the bike racks that will be installed in places lacking adequate bike parking along the HOT lanes corridor. We will also be conducting bike commuting seminars at large corporations in the corridor. At the seminars we talk about bikes and other gear needed for commuting, clothing strategies, safe cycling skills, and bike route map resources.
Thanks to Transurban for supporting bicycling in Fairfax.
Labels: beltway, bike lights, hot lanes, Transurban
Saturday, January 31, 2009
Public hearings on I-95/I-395 HOT lanes project
VDOT is holding public hearings on the proposed I-95/I-395 HOT lanes project at three locations in Northern Virginia Feb. 9-11:Monday, February 9, 2009, 5-9 p.m.
(Snow Date: Thursday, February 12)
Potomac High School
3401 Panther Pride Drive, Dumfries, VA 22026
Tuesday, February 10, 2009, 5-9 p.m.
(Snow Date: Thursday, February 19)
Robert E. Lee High School
6540 Franconia Road, Springfield, VA 22150
Wednesday, February 11, 2009, 5-9 p.m.
(Snow Date: Wednesday, February 18)
Minnie Howard School
3801 W Braddock Road, Alexandria, VA 22302
(Snow Date: Thursday, February 12)
Potomac High School
3401 Panther Pride Drive, Dumfries, VA 22026
Tuesday, February 10, 2009, 5-9 p.m.
(Snow Date: Thursday, February 19)
Robert E. Lee High School
6540 Franconia Road, Springfield, VA 22150
Wednesday, February 11, 2009, 5-9 p.m.
(Snow Date: Wednesday, February 18)
Minnie Howard School
3801 W Braddock Road, Alexandria, VA 22302
Find out how this project will affect bike projects along this corridor. The most critical bike crossing is the bike/ped bridge just south of Franconia-Springfield Parkway that leads to the Franconia-Springfield Metro and Springfield Mall. If you depend on this bridge across I-95, find out what is included in the current project plans, and speak out for retaining this bridge as part of the project.
Tuesday, June 8, 2010
HOT lanes meeting Wed. night
As we mentioned earlier, cyclists are encouraged to attend a meeting on the proposal to extend the Beltway HOT lanes north toward the American Legion bridge. The bridges at Old Dominion Dr and Georgetown Pike bridges will be rebuilt and if bicycle facilities are not included now, there will not be another opportunity in our lifetime.The meeting is Wednesday, June 9 at 7:30 pm at the McLean Community Center, 1234 Ingleside Avenue, McLean.
Labels: dranesville district, hot lanes
Thursday, September 16, 2010
Wakefield bike/ped bridge update - Closure postponed
The Wakefield Park bike/ped bridge was scheduled to close this week but the closure has been postponed until September 20-24. We've asked that signs be placed well in advance of the closure, not only at the bridge, but at entrances to the park. Cyclists must ride long distances to reach the bridge and they should have plenty of warning about any closures. According to the HOT lanes project:The HOT Lanes Project did not close the Wakefield Park bridge this week to raise the structure but we are on track to close it starting on September 20-24, weather permitting. We will post signs today or early tomorrow on the bridge and on the pathways leading up to the bridge advising users of this four day closure. We are updating our fact sheets today and will post those online and at the park. Please contact me if you have any questions.
Labels: hot lanes, wakefield bridge
Friday, July 4, 2008
W&OD Trail bridge over the Beltway
Construction for the HOT lanes project has begun, and as the project progresses, more and more news articles are appearing, like this one in the Post about the loss of the tree buffer along the Beltway. We were asked recently if the W&OD Trail bridge over the Beltway will be closed when it is rebuilt as part of the project.At the HOT lanes public hearings we asked VDOT and contractor staff that same questions. We were assured that the new trail bridge would be built before the old one is removed, and that there would be a very short period during which traffic from the old bridge would be switched to the new one. Since the new bridge will be offset from the old one, there will be a gradual curve approaching and existing the bridge from the trail. If you hear otherwise, please let us know. We will continue to monitor this and other bicycle access issues during the project.
Labels: W and OD Trail








