Sunday, April 1, 2018
 

Columbia Pike Pedestrian and Bicycle Study Events This Saturday

FCDOT will hold two outreach events next Saturday, April 7, to solicit feedback on the Columbia Pike Pedestrian and Bicycle Study.

The first will be at the Bailey's Crossroads Safeway at 5821 Crossroads Circle in Falls Church, and the second one will be at the Giant Food at 7137 Columbia Pike in Annandale. FCDOT staff will be in front of the stores from 10:00 am to 2:00 pm to listen to you inputs and ideas. 

The goal of the Columbia Pike Pedestrian and Bicycle Study, which was recommended by the Fairfax County Bicycle Master Plan, is to make walking and biking safer and more enjoyable along the 4.5 miles of Columbia Pike from Annandale to Bailey’s Crossroads. Potential recommendations to make biking and walking safer include new and expanded sidewalks, new trail connections, shared use paths and intersection improvements.

FABB encourages local bicyclists to visit the events and speak up in support of better bicycling and walking infrastructure. Comments also will be accepted online through April 20 here.


Labels: , , ,

(0) comments
Sunday, June 4, 2017
 

Successful Annandale Ride

FABB and the Association of Pedestrian and Bicycle Professionals DC chapter held a joint ride on Saturday to explore new and planned bike infrastructure in the Annandale area (route map). The group of 18 riders met at East Falls Church Metro station. Fairfax County Bike Coordinator Adam Lind and FABB's Dave Wagoner led the group, with Adam stopping periodically to offer insights into the planning and implementation of the new facilities. We passed through neighborhood streets south to the service road on Route 50 to new bike lanes on Annandale Road, making our way to Gallows Road and on to the Annandale business district.



We stopped for lunch at the trendy new eating place The Block, reviewed in the Post back in Februrary. Unfortunately there was no bike parking, something we'll need to advocate for in the future. From there part of the group took a longer loop south along new bike lanes on Ravensworth Rd and Heritage Dr, then north to Hummer Rd where bike lanes are planned. Just before returning to East Falls Church the two groups rejoined.

The ride was a great opportunity to meet cyclists from around the area, many of whom are advocating for better bike conditions. Glad that Greg Billing, WABA Executive Director could join the ride along with several folks from APBPDC including some staff from Toole Design Group, the company that helped the county put together our bike map and Bicycle Master Plan. Thanks to Adam and Dave for working together on the ride, and to APBPDC for co-sponsoring. Adam announced that the county bike program will soon be sponsoring similar rides around the county this summer.

Labels: , , , , ,

(0) comments
Monday, May 23, 2016
 

Meeting on McWhorter Place Trail on Wed. May 25

McWhorter Place is located south of Route 236 in Annandale, just inside the Beltway. It is an important bicycle route with a very low speed limit. There is a missing connection between two segments of the street that is currently a goat trail used by bicyclists and pedestrians. Fairfax County plans to build a new trail connecting the two street segments. Bike lanes are planned on the eastern section of McWhorter Place and John Marr Dr, another reason this is an important connection. Cyclists in the this area are encouraged to support this project at the meeting on Wed.

From Fairfax County's McWhorter Place Trail Project page:

Community Meeting Set for May 25, 2016
Mason District Supervisor Penny Gross and the Fairfax County Department of Transportation (FCDOT) will host a community meeting on the McWhorter Place Trail Project on Wednesday, May 25, 2016, in the cafeteria of Annandale High School, 4700 Medford Drive, Annandale. The meeting will feature an Open House at 7 p.m., to view a display of proposed improvements, followed by a short presentation at 7:30 p.m., with time for questions and answers.

FCDOT ensures nondiscrimination in all programs and activities in accordance with Title VI of the Civil Rights Act of 1964 and the Americans with Disabilities Act (ADA). If you need this information in an alternate format, contact FCDOT at 703-877-5600, TTY 711. Requests for assistance must be received at least 7 business days in advance of an event.
Project Background
The McWhorter Place Trail is part of the six year bike and pedestrian program. The first segment is a 6 foot wide and approximately 65 foot long asphalt walkway connection between the eastern and western cul-de-sacs on McWhorter Place. The second segment is a 5 foot wide and approximately 60 foot long concrete sidewalk to close the existing missing sidewalk link along the western McWhorter Place cul-de-sac. Click on the image below to expand:


Location of future McWhorter Place trail


Labels: , ,

(1) comments
Wednesday, May 11, 2016
 

Little River Turnpike Bicycle Study Meeting Set for May 17

FABB wants to alert members and other interested riders and citizens to a community meeting hosted by the Fairfax County Department of Transportation on Tuesday, May 17, to discuss ways to improve bicycling along Little River Turnpike from the City of Fairfax to Alexandria. The goal of this public forum is to gather information from local residents on existing conditions, problem locations, and short- and long-term improvements that will make bicycling viable in this corridor. 

Photo Courtesy of FCDOT. 

The meeting will be held at Annandale Terrace Elementary School, 7604 Herald St., Annandale, at 6:30 pm.

For more information on the project, please visit Fairfax County Government webpage here. 

Labels: , , , ,

(0) comments
Wednesday, March 16, 2016
 

March-April 2016 FABB Newsletter

March-April 2016 FABB News
A bi-monthly publication of Fairfax Alliance for Better Bicycling
www.fabb-bikes.org

FABB Meets in Mason District on March 16

The March FABB monthly meeting will be held at Poe Middle School, 7000 Cindy Ln, Annandale in the Mason District. The meeting starts at 7:30 p.m. on Wednesday, March 16. All cyclists are invited to attend and discuss how we can make the district more bike friendly. As we develop our priorities for the coming year we want to hear what you think are the most important projects in the area.

FABB Members Attend National Bike Summit, March 7-9

summit_2016_gridSeveral FABB members attended the three-day National Bike Summit sponsored by the League of American Bicyclists in Washington, DC. During the Summit they were able to network with other Virginia advocates (BikeWalk RVA, VBF, BikeArlington, etc.) and others from around the country, learning and sharing about their mutual efforts. To advance our work in Fairfax County, the FABB attendees chose to focus on workshops to learn about the Bicycle Friendly America program, Mayor's Challenge for Safer Streets, bikeshare and Vision Zero. They also learned about bike education in schools and new counting/data collection  methods. On the final day they joined hundreds of cyclists on Capitol Hill for Lobby Day.  

Fairfax Embarks on Plan for Better Bicycle Access to Vienna Metro Station

Fairfax County Department of Transportation recently held a meeting to ask people their thoughts about how to improve bike access to the Vienna Metrorail Station. The meeting was the kickoff of the Vienna Metrorail Bicycle Access Study. After a brief presentation, about 20 people gathered around maps of the station area to mark where improvements such as protected bike lanes are needed. The contractor, VHB, will take that input, conduct field work, and develop detailed recommendations. The study will be completed in June. Approximately $1M in project funds is available.

May Full of Major Bike Events

btwdBike to Work Day, Tour de Fat, and DC Bike Ride are happening on Friday-Sunday, May 20-22. This year Fairfax is hosting 14 Bike to Work Day Pit Stops on May 20, and FABB will be at most of them discussing our work and handing out literature. On Saturday, May 21, FABB volunteers will help the fabulous Tour de Fat folks hold the best bike party of the year. If you're interested in helping out during either the morning or afternoon shifts, please let us know. DC Bike Ride is a car-free ride through the District on Sunday, May 22.  Finally, May 4 is National Bike to School Day. Why not reach out to your local school to see if they have activities planned and/or need help with bike rides to school?

Adventure Cycling in Reston

Adventure Cycling Association, Reston Association, and Reston Bike Club held a special gathering on Sunday, March 6. Adventure Cycling staff members Ginny Sullivan and Saara Snow discussed events planned for Adventure Cycling’s 40th anniversary: National Bike Travel Weekend, June 3–5, the Montana Bicycle Celebration, July 15–17, and Bike Your Park Day on September 24. They also highlighted their tours program, membership, new routes, progress on the U.S. Bicycle Route System, and other national advocacy projects. FABB discussed our work along with presentations by Friends of the W&OD Trail, Reston Bike Club, and WABA. Adventure Cycling is a great national bike organization and if you aren't a member, we recommend that you join. If you would like to join, contact me and I'll send you a redemption code for a free 6 month membership (new members only, 2 codes available).

Bicycle Bills in Virginia Legislature

getting-doored_signTwo bike bills are making their way through the Virginia legislature. SB 117, the Dooring bill "Requires drivers to wait for a reasonable opportunity to open vehicle doors on the side adjacent to moving traffic. A violation constitutes a traffic infraction punishable by a fine of not more than $50." The bill was approved by both the Senate and House and will go to Gov. McAuliffe for his signature. Thanks to everyone who wrote to your legislators to urge them to approve the bill. Thanks also to Senator Chap Petersen for sponsoring the bill and working to ensure it made it through both houses.

SB 669, the Maintenance Reimbursement bill "Provides that cities and towns that receive highway maintenance payments from the Commonwealth based on moving-lane miles of highway will not have such payments reduced if moving-lane miles of highway are converted to bicycle-only lanes..." This bill was "Continued to 2017."

Meeting on W&OD Trail Bridge over Wiehle Ave on March 17

wiehle-bridge1Fairfax County plans to build a bridge on the W&OD Trail over Wiehle Ave. A public hearing on the project will be held on Thursday, March 17 from 6:30-8:30 p.m. at Reston Community Center at Hunter Woods, 2310 Colts Neck Road, Reston.  This is an opportunity to learn about and discuss the current design options. The Wiehle Ave crossing has been the site of several bike crashes in the past. This bridge will allow cyclists to completely bypass the at-grade crossing. Access to Wiehle Ave from the W&OD Trail will be via paved side trails from east and west of the bridge. See the FABB blog for current plans and design concepts.

Meeting on Proposed Bike Lanes in Annandale on March 21

MasonDistrictBikeMap-350Fairfax County will hold a meeting on March 21 to discuss plans to install bike lanes on several roads in the Annandale area as part of the summer repaving cycle. Cyclists are encouraged to attend the meeting to support the projects. Without your support these projects may not happen.

From the Fairfax County site Mason District Bike Lanes: "Join Fairfax County Department of Transportation staff on Monday, March 21, 6:30-8 p.m., at the George Mason Regional Library, 7001 Little River Turnpike in Annandale, and learn about proposed bicycle enhancements that can be implemented with road repaving this year. Bicycle facilities are proposed on Heritage Drive, John Marr Drive, Markham Street, McWhorter Place, and Ravensworth Road."
-----
If you don't already, please Like us on Facebook and follow our Twitter feed. If you have news about bicycling in Fairfax to share with our readers, please submit brief articles to news@fabb-bikes.org.

Upcoming Events


Labels: , , , , , , ,

(0) comments
Saturday, March 12, 2016
 

Meeting on Proposed Bike Lanes in Annandale March 21

Proposed bike lanes
in Annandale
Fairfax County will hold a meeting on March 21 to discuss plans to install bike lanes on several roads in the Annandale area as part of the summer repaving cycle. Cyclists are encouraged to attend the meeting to support the projects. Without your support these projects may not happen.

 From the Fairfax County site Mason District Bike Lanes:
Join Fairfax County Department of Transportation staff on Monday, March 21, 6:30 - 8 p.m., at the George Mason Regional Library, 7001 Little River Turnpike in Annandale, and learn about proposed bicycle enhancements that can be implemented with road repaving this year.

Project Background
Mason District soon may have new bike lanes, as part of VDOT's summer road repaving projects. Bicycle facilities are proposed on Heritage Drive, John Marr Drive, Markham Street, McWhorter Place, and Ravensworth Road. Click on the image to enlarge the map.

Labels: , ,

(0) comments
Thursday, June 7, 2012
 

South County public meeting summary

Annandale meeting participants
The final Bicycle Master Plan public meeting was held last night (Wed.) in Annandale. About 40 cyclists learned about the proposed bicycle network and other recommendations. Most people had attended other bike plan meetings.

During the meeting Cindy Engelhart, VDOT NoVA District bike coordinator, noted that that due to new legislation (see 15.2-2223, item B.4.), any changes to the county Transportation Plan must be approved by VDOT. This would delay approval of the plan since VDOT has 90 days to submit comments. The current goal is to have the bicycle plan approved by the end of this year.

An audience member asked about the possibility of a bond referendum to fund bike improvements. The answer was that some projects are being funded by the 2007 transportation bond and another transportation bond is planned. However, we think a bike-specific bond would be feasible. Why not ask residents if they would support a bike projects through a bond?

Results of the earlier survey were discussed. In a report of the Tuesday meeting we mentioned the top reason that people say keeps them from biking. The graph on the left shows the top six reasons. It was pointed out that the top 3 reasons, gaps in the bike network, barriers to travel, and continuous facilities don't exist for local trips, all relate to gaps in the system.

The top initiatives chosen by the meeting attendees were:
1. Form a countywide bicycle advisory committee.
2. Begin a trail maintenance program.
3. Focus attention on the VDOT resurfacing program.
4. Strengthen the existing bike program.
5. Launch a law enforcement initiative.
I think the most controversial recommendation is the treatment of what are referred to as "Big Roads." These are the major arterials such as Routes 1, 7, 50, 236, Braddock Road, etc. These are also the roads that create major barriers for most bicyclists. Most bike-friendly neighborhood streets don't connect to destinations. They feed into the big roads which have very few connected bike facilities. The off-road connections usually have many conflict points. Well-designed cycletracks are a good solution but are costly to implement and usually require additional right of way.

The recommendation for these roads is a table of possible treatments based on surrounding land use. Our concern is that unless the county holds to a strict policy of requiring the most appropriate facility, some developers may only implement the most low-cost solution. It could also be difficult to have a continuous, consistent design if there are options. There will likely be much discussion of this recommendation at the BAC meeting next week.

The next step in the process is for the Bicycle Plan Bicycle Advisory Committee to discuss the recommendations at our June 13 meeting. While the committee has previously seen most of the route network, the public meetings were the first chance to learn about the policy recommendations and the top initiatives. We'll need to discuss them at length, review the public meeting feedback, and develop a consensus.

Update: See the Fairfax City Patch article on the meeting, Cyclists Make Suggestions to Bike Master Plan.

Labels: , ,

(1) comments
Monday, May 21, 2012
 

Final Bicycle Master Plan meetings scheduled

Fairfax County just announced the final two countywide public meetings on the Bicycle Master Plan. The North County meeting is June 5 in Reston and the South County meeting is June 6 in Annandale. The final draft proposed route network will be presented along with policy and program recommendations.

This is the last opportunity to ensure that recommendations you made during the development of the plan are included in the route network or policy recommendations. The plan has been under development over the past year. Several FABB members are on the plan advisory committee and FABB was represented at all of the area meetings and the thematic meetings.

Please consider attending one of the following meetings:
North County Meeting
Tuesday, June 5, 6:30 - 8:30 p.m.
Reston Regional Library
11925 Bowman Towne Drive, Reston, VA 20190

South County Meeting
Wednesday, June 6, 6:00 - 8:30 p.m.
George Mason Regional Library
7001 Little River Turnpike, Annandale, VA 22003

Labels: , ,

(0) comments
Thursday, February 16, 2012
 

Annandale-Falls Church area bike plan meeting report

Last night cyclists from the Annandale and Falls Church area gathered at the Mason District office to hear about the countywide bicycle master plan. After a presentation by Bob Patten of Toole Design Group, cyclists marked up detailed maps of the area to highlight existing routes, popular destinations, and barriers to travel.

This was the sixth of eight meetings focused on different parts of the county. The Annandale-Falls Church bike plan area is located inside the Beltway south of I-66. There are several major barriers to bike travel: I-66 in the north, the Beltway, I-395, and Lake Barcroft. The bridges over the Beltway are being rebuilt as part of the HOT lanes project and many will have bicycle facilities, the roads leading to those bridges have few if any bike accommodations.

There was discussion of the lack of trail maintenance and the problem of identifying which agency or group is responsible for local trails. VDOT does maintain some paved trails in their right of way but the County is responsible for most, and there is almost no money available for repaving or repair. One way to find out who should maintain a specific trail you can contact the bike program office.

VDOT Snow Map
During the discussion, the VDOT NoVa district Bicycle and Pedestrian Coordinator Cindy Engelhart noted that the new VDOT snow map shows the location of all VDOT maintained roads. This is an interesting interactive mapping tool used to show the plowing status of all roads in Fairfax County that are maintained by VDOT. By hovering over the neighborhood icon all streets maintained by VDOT are highlighted according to their plowing status: Plowed, In Progress, Not Started (or No Event in black). Those streets not highlighted are maintained by others, either the county or homeowner associations.

An interesting statistic mentioned during the briefing is that most commuting trips (92,000) are greater than 3 miles in length (87%) but 34% of all other trips (272,000) are less than 3 miles, trips that with good bike facilities can easily be made by bike.

Marking up bike plan map
The Annandale area is not flat and one cyclist suggested showing elevation on bike route maps which can be valuable information for cyclists planning a trip. Currently Google Map bike directions does factor in elevation when calculating routes.

To see notes and information from the other bike plan meetings visit the bike plan Materials & Resources page.

After the bike plan meeting we held the monthly FABB meeting. One of our goals this year is to move the meeting location to different parts of the county. This was a good opportunity to do that, participate in the bike plan meeting, and meet some new cyclists.

FABB meeting
County bike coordinator Charlie Strunk reported that the contract for building bike lanes on Gallows Road from the W&OD trail north into Tysons to Old Courthouse Road was awarded. The project will be completed this year. The county bike route map is being updated and a draft of the map is currently being reviewed. Printed copies should be available by Bike to Work Day on May 18.

FABB member Douglas Stewart passed around a report assessing various bike routes between GMU and the Vienna Metro station. The next step is to work with the City of Fairfax to sign the route and make any needed improvements.

FABB is now a RoadID affiliate. If you visit the FABB homepage and click on the RoadID icon (or click on the icon on the left), 10% of any RoadID products you purchase within 60 days will be donated to FABB. We also have a new rack card. Thanks to TYTRAN, the Tysons transportation group with whom we're coordinating the Tysons Bike Group meetings, for helping us with the printing costs of the card.

Labels: , , , ,

(0) comments
Tuesday, February 14, 2012
 

Annandale Bike Plan and FABB Meetings tomorrow

This month FABB will move our monthly meeting to coincide with the Annandale Bike Plan Meeting. Both meetings will be held tomorrow, Wed. Feb. 15 at the Mason District Governmental Center, 6507 Columbia Pike, Annandale. The bike plan meeting is an open house that begins at 4:30 p.m. There will be a presentation at 6:00 p.m. The event is scheduled to end at 8:00 p.m. The FABB meeting will start at 7:30 p.m. in an adjacent room. Everyone is welcome to attend both meetings.

This is a good opportunity for cyclists to let the bike planners know where you ride, where you can't ride because of obstacles, and what the county can do to make the Annandale area more bike-freindly. There are many people who get around by bikes in this area. Many are service workers who rely on bikes for transportation. All cyclists in the area need better on- and off-road bike facilities, including adequate bike parking. School kids need safe ways to ride their bikes to school and places to park when they get there. They also need bike safety education classes. Let your voice be heard by attending this important meeting.

Labels: , , ,

(0) comments
Monday, June 21, 2010
 

Annandale and Bailey's Crossroads bike plans

Planning for the redevelopment of the Annandale and Bailey's Crossroads business centers (community business centers, CBC) is nearing completion. We just learned that the Fairfax County Planning Commission will hold two public hearings on June 23 to discuss changes to the comprehensive plans for these two areas. The changes include recommended bicycle facilities. The Annandale plan contains general language about the need for better bike facilities, including: "Bicycle lanes should be provided within the Annandale CBC where appropriate."

The Bailey's Crossroads plan contains much more detailed recommendations for bicycle facilities, including a map showing planned bike lanes on specific streets. Street cross sections show recommended bike lane widths. However, bike parking guidlines are vague:  "In an effort to encourage bicycling in Baileys Crossroads CBC, safe, secure, and convenient bicycle parking should be provided. The number of bicycle parking spaces should be determined based on the planned land uses."

If you are familiar with these areas, please take the time to review the proposed plans and see what you think. The Annandale plan needs work. At a minimum we think that the bike routes shown on the county bicycle map should include bicycle facilities, either bike lanes or wide curb lanes. Bicycle parking guidelines for the county, that have been under development for three needs, need to be finalized. Send comments about both plans to Mason District Supervisor Penny Gross and Mason District Planning Commissioner Janet Hall. It would help to attend the public hearing and speak out for better bicycle facilities in these two urban areas.

If the county had a comprehensive bicycle plan and bicycle parking guidelines, updating the area plans would be straightforward. As it is, each plan is approached in separately, as resources become available. Fortunately the bicycle planning process has started. Phase I of a countywide plan will begin in Tysons. A contract for the bicycle master plan for Tysons Corner is being negotiated this month, with work expected to begin in July.

Labels: , ,

(0) comments
Monday, November 9, 2009
 

Annandale bike light giveaway

FABB installed over 40 sets of bike lights yesterday at the Annandale United Methodist Church on Columbia Pike at Gallows Road. It was a beautiful Fall day. The first two hours were very busy and we had several volunteers there to help install the lights, which can take a few minutes given the variety of sizes of handlebars and seatposts/seatstays. Several people came in response to the WABA email alert. A few service workers who use bikes for their main transportation came as well.

Thanks to the church for letting us set up on their parking lot. And thanks to the FABB volunteers for coming out and to Nohemy Miranda of the county bike program, who also took the photos. A special thanks to Dale Ruhter, a church member and bike commuter who helped us throughout the afternoon.

Our next event is on Thursday at St. Anthony's Catholic Church in the Culmore area. The church is located on 3305 Glen Carlyn Road at Route 7, just west of Columbia Pike. We'll be there from 4-6 p.m.

Labels: ,

(0) comments
Contact FABB via email: info@fabb-bikes.org

Subscribe to the
FABB e-newsletter


Subscribe to posts:
[Atom 1.0] or [RSS 2.0]





  Bike to Work Day 2015 at Wiehle Station

  Transportation choices

This page is powered by Blogger. Isn't yours?

Archives