Friday, February 27, 2015
 

Cyclists attend Burke/Shiplett meeting - Update

Several cyclists attended the meeting last night on proposed bike lanes on Burke Road and Shiplett Boulevard. Supervisor Herrity and Planning Commission Chairman Murphy were also there.

On both roads, lanes would be narrowed to allow striping of bike lanes for long sections of the roadway. Such treatment is known as a "lane diet." Where not enough room is available for bike lanes, shared lane markings, "sharrows," would be used.

One person expressed a concern about cost and it was pointed out that since both roads will be repaved, changing the striping pattern to include bike lanes has a minimal impact, if any, on the cost of the project.

There is a lot of pent up demand for better bicycle and pedestrian facilities in the area. Several people noted that without sidewalks, people are often seen walking on Burke Road. Burke Village Center is located nearby. Others talked about the need for trail maintenance, especially snow clearing on popular trails.

In the image on the right, the red section of Burke Road will be striped with bike lanes.  The other sections will likely have sharrows. A few people were concerned that the sharrows would encourage inexperienced cyclists to ride on a dangerous road. Others wanted the sharrows to warn motorists to expect cyclists and help prevent motorist harassment of cyclists.

The red section of Shiplett will be striped with bike lanes. The blue, green, and yellow sections will have a climbing lane in one direction and various options for wide shared lanes with sharrows in the other direction. There is not enough room for standard bike lanes on both sides.

The presentation will be posted on the county bike pages in the near future.

Update: Cyclists are encouraged contact Supervisor Herrity and/or Adam Lind to show your support for these projects.

Labels: , , , ,

(0) comments
Tuesday, November 4, 2014
 

Fairfax voters overwhelmingly support ped/bike project funding

According to the unofficial results from Fairfax County, the 2014 Transportation Bond was approved 214,344 to 83,999. The $100 million bond includes $77.5 million in pedestrian projects, $6.5 million in bike projects, and $16 million in spot road projects. The vote shows that Fairfax residents want safe walk and bike routes and they are willing to pay for them.

The bike projects include:
  • Wakefield Chapel Rd Walkway/Bike Lanes
  • Lake Braddock Drive Road Diet
  • Burke VRE Connector Ph. IV
  • Cross County Trail Upgrades
  • Burke Road Bike Lanes
  • West Ox Road Trail
  • Route 50 Trail
  • Elm St/Dolley Madison Blvd Improved Pedestrian and Bicycle Crossing
  • Franconia-Springfield Metrorail Station/VRE Enhanced Bicycle Parking
  • Government Center Area Bicycle Demonstration Project
  • Northern Virginia Community College Medical Education Campus, Springfield
  • Vienna Metrorail Station Area Bicycle Connectivity Improvements
  • Westmoreland Street On-Road Bike Lanes
  • Westmoreland Street/Rosemont Drive
Even though Springfield District Supervisor Herrity opposed the bond in a broadcast message sent out yesterday, Springfield District voters thought otherwise, voting 23,834 to 11,220 in support of the bond.

Thank you Fairfax voters!

Labels: ,

(0) comments
Thursday, June 19, 2014
 

Supervisor Herrity continues his War on Bikes

Supervisor Herrity at BTWD 2008. On his trip
he had a flat tire, probably from an
unmaintained bike trail.
Yesterday WTOP reported on this weeks Board of  Supervisors meeting at which they voted on the list of projects to be included in the 2014 Transportation Bond. See our blog post about the bond projects. WTOP seems to be stoking the so-called 'War on Cars" with their inflammatory headline Fairfax County supervisors raise concern about 'war on cars.' The headline should have read "Supervisor Herrity continues his war on bikes."

Supervisor Herrity thinks Fairfax County is spending too much money on bike and pedestrian facilities. Funny, I haven't really noticed much impact of all this funding on bikes. Bike lanes that I use on Soapstone Dr. and Lawyers Rd. cost almost nothing because they were created as part of repaving and restriping projects.

Fairfax County is proposing to fund $6 million in bike projects as part of the bond and $77.6 million in pedestrian projects. The county plans to spend $1.4 billion on all transportation projects over the next six years, most of which are being funded by new state monies. The county has decided that bike and ped projects don't qualify for these new funds so they are included in the bond project. The $6 million for bike projects is 0.46% of $1.4 billion. 

And yet Supervisor Herrity thinks that's too much. Knowing full well that most of the county funding is going toward expanding roads, building large interchanges, and building parking garages at Metro stations he states the following: "The scope and extent of the $85 million in bike and pedestrian projects included in this referendum far exceed both the current and projected mode share, especially given that we've got so many unfunded projects that would relieve significant congestion."

For the second time in the past month he goes on to mischaracterize the amount of space devoted to bikes and peds on the proposed Soapstone Connector bridge in Reston: "You take the proposed Soapstone Connector: 35 feet of that, or 60 percent of it is now proposed for bike and pedestrian yet it shows as a highway expansion," The proposed Soapstone Connector bridge, located near the new Wiehle-Reston East Metrorail station, is 99.5 feet wide. Significant bike and ped traffic is expected in the near future. There are four 12-foot lanes for motor vehicles. Bike lanes comprise 10 feet or 10% of the total width. The 10 foot trail comprises 10%. The 5 foot sidewalk is 5 %. The total devoted to bikes and peds is 10 + 10 + 5 or 25%.

Soapstone Connector cross section
Fairfax County is spending nearly a $BILLION on projects used by motorists. They are also trying to rectify some of the errors of the past when roads were built without any bike or ped facilities, and yet Supervisor Herrity thinks we're not spending enough to support motorists.

Fortunately the majority of the Board disagrees with Herrity and they voted to include the proposed ped and bike projects in the bond. Despite the small amount of funding for bike projects, we strongly support the bond referendum and urge you to support it as well.

You may recall that more than once Supervisor Herrity has tried to eliminate the bike coordinator position and he continues to argue against additional funding for bike facilities. Feel free to contact Supervisor Herrity to let him know what you think.

Labels: ,

(0) comments
Wednesday, May 23, 2012
 

Law Enforcement focus group meeting today

Today we rode to the West Springfield Government Center from Reston to attend the final Bicycle Master Plan focus group meeting. We've attended all of the 5 meetings, Economic Impacts, Biking and Health, Bike Safety Education, School Transportation, and Biking and Law Enforcement Issues.

Several police officers attended today's Law Enforcement meeting. Issues discussed included the need to ensure officers have the necessary time to collect eyewitness accounts from bicyclists who may have been injured and taken to the hospital. Often police are required to submit their reports at the end of the day and don't have time for proper followup.

It was noted that there is very little discussion of bicycle laws at the police academy. Most of the time is spent discussing motor vehicle code. We discussed the stop signs on the W&OD Trail that are not valid VDOT signs and are not enforceable.

The top problems cited were: motorist and bicyclist disregard of traffic rules. Better bicycle safety education is needed along with motorist education about the rights of bicyclists. Similar recommendations were made in several of the other focus groups. Better enforcement is also needed, and not just targeted a bicyclists.

Most of the focus group meetings have been productive but they were all too short and didn't provide enough time for discussion, not only of current issues, but also possible solutions. These are complex topics and participants have busy schedules and so there's only so much that can be covered in under 2 hours. The eight area meetings, which we also attended, were longer and there was more time for discussion.

The next step in the process is to hold two countywide public meetings scheduled for June 5 (Reston) & 6 (Annandale). Then the planning team will finalize the bicycle network and policy and program recommendations and present the final plan. The goal is to complete the plan by the end of June or first of July.

The ride from Reston took about an hour and a half. The first half of the route was on the W&OD Trail to Vienna. From there I followed local streets and a short stretch of Route 50 to University Dr and on to GMU, then more local streets to the worst stretch, Rolling Road from Lake Braddock Dr to the government center.

There is a trail along Rolling Road that I decided to check out (I usually ride in the road). The trail switches between a narrow concrete sidewalk to a wide paved trail to a narrow paved trail, with lots of overgrowing vegetation and sever root damage in front of West Springfield High School. This must not be one of our award-winning trails. There was no bike rack at the government center so I stopped by Supervisor Herrity's office to request one.

Labels: , , ,

(0) comments
Monday, June 9, 2008
 

Supervisor Herrity rides on Bike to Work Day

There are photos of Supervisor Herrity's 15 mile ride to work on Bike to Work Day back on May 16 on the Supervisor's website:

“On Bike To Work Day, Friday, May 16, Supervisor Herrity rode his bike from his home in the Little Rocky Run neighborhood in Clifton to one of the regional pit stops at University Mall at Braddock Rd. and Rt. 123. After meeting several fellow riders, he continued to his Springfield District Office on Rolling Road, for a total of 15 miles.”

Congratulations to Supervisor Herrity for being an example to others and participating in Bike to Work Day.

Labels: ,

(0) comments
Contact FABB via email: info@fabb-bikes.org

Subscribe to the
FABB e-newsletter


Subscribe to posts:
[Atom 1.0] or [RSS 2.0]





  Bike to Work Day 2015 at Wiehle Station

  Transportation choices

This page is powered by Blogger. Isn't yours?

Archives