Wednesday, January 11, 2017
 

Bike-related Bills in 2017 VA Legislative Session

Today the 2017 Session of the General Assembly Session convened for a 45-day session. Virginia Bicycling Federation is working with Senators and Delegates on several bills that could impact bicyclists. See the VBF website for the full report. Below is a summary of bills under consideration:

SB 860 Use of handheld personal communications devices while driving; penalty. Would prohibit usage of handheld personal communication devices while driving. Filed by Sen. Surovell.

There are two other bills from Sen. Surovell that do not yet have bill numbers. He is "introducing a 'vulnerable user' bill which creates a lower criminality threshold and higher penalties for drivers who injure pedestrians and cyclists.   Also, in an attempt to address the scourge of vehicles continuing to pass stopped vehicles on Sherwood Hall Lane, I am introducing legislation to make clear that bicycle lanes cannot be used by cars to pass other vehicles.

SB 1207 & HB 2016 Electric personal delivery devices. Identical bills filed by Sen. DeSteph and Del. Villanueva: Allows for the operation of electric personal delivery devices on the sidewalks and shared-use paths and across roadways on crosswalks in the Commonwealth unless otherwise prohibited by a locality. The bill directs that such devices shall not be considered vehicles and are exempt from the motor carrier provisions of Title 46.2 (Motor Vehicles).

HB 1504 Issuance of a driver's license or learner's permit; minimum standards for vision tests; and HB 1514 Health care practitioners; reporting disabilities of drivers. Two bills attempting to get drivers with poor vision off the road that was filed at the request of Dr. Ed Wortham, an ophthalmologist and the father of Carrie Wortham, who was killed in September 2015 by a driver with poor vision who drove into her as she was cycling on Rt. 33. Filed by Del. Fowler.

HB 1834 Distracted driving; penalty. Adds a “Distracted Driving” offense to the section of the Code that prohibits Reckless Driving (46.2-868).  This will add a lesser infraction to the code for infractions that are not as severe as to warrant “Reckless Driving” which has traditionally been considered a very severe charge in this state. Filed by Del. Anderson.

HB 2023 Highway maintenance payments; bicycle lanes. The bill to not reduce highway maintenance payments to municipalities that have implemented road diets. Filed by Del. Villanueva.

Labels: , ,

(0) comments
Friday, September 5, 2014
 

September-October 2014 FABB News

A bi-monthly publication of Fairfax Advocates for Better Bicycling
www.fabb-bikes.org

Bicycle Master Plan

Countywide Bicycle Master Plan will soon be considered by the Board of Supervisors. The Planning Commission will hold a public hearing on October 1 and the Board of Supervisors will hold a public hearing on October 28. To learn more about the plan, the second of three countywide public meetings is scheduled for September 15 at Mt. Vernon Government Center, 2511 Parkers Ln, Alexandria, VA 22306.

Visit the county bike plan webpage for links to the "Fairfax County Bicycle Master Plan - Final Draft" and the four "Maps of Recommended Bicycle Network." We encourage all Fairfax cyclists to consider attending the October 1 and 28 public hearings. See the FABB blog for details as we get closer to those dates.

2014 Transportation Bond Will Fund Pedestrian and Bicycle Projects

After a series of public meetings over the past year, Fairfax County identified a long list of high priority transportation projects. Funding for road and transit projects will come from money allocated by the Commonwealth of Virginia. After deciding that most pedestrian and bicycle projects were not eligible for those state funds, the county plans to fund those projects using the 2014 Transportation Bond. While most are pedestrian projects such as new sidewalks, several important bike projects are included.

We strongly support the Bond and encourage all county residents to vote YES on November 4 to improve pedestrian and bicycle access. See the list of all projects that will be implemented if the Bond passes.

Northern Virginia Cycle Fest Sunday, September 14

Northern Virginia Cycle Fest is a series of mostly on-road rides in Fairfax and Arlington Counties. The event will be held on Sunday, September 14. Four ride options, departing at 7:30 a.m., range from 11 to 62 miles. All rides originate and return to the Jewish Community Center of Northern Virginia, 8900 Little River Turnpike. The rides are designed to be fun and challenging for riders of all levels and experience - with a suggested minimum age of 12. FABB will have an information table at the event.

Riders should be comfortable riding on roads with traffic. All ride options have rest stops, SAG vehicles, mechanical support, merchant sponsorship and light refreshments. The 2014 ride benefits Wounded Warriors Project and Washington Area Bicyclist Association (WABA). For more information, visit the Northern Virginia Cycle Fest website. Fee: $50/$45 JCCNV members/$20 active military and first responders.

Bike Lanes Striped on Sherwood Hall Lane in Mt. Vernon District

VDOT is completing bike lanes on Sherwood Hall Lane as part of a repaving/pavement marking project to improve safety. Bike lanes were added in both directions from Fordson Road to Fort Hunt Road, about 1.5 miles. As the street is not wide enough for bike lanes in the one-block, 450-foot segment from Holland Road to Parkers Lane, shared-lane markings, known as "sharrows," were installed to let cyclists and motorists know that bikes will share the travel lane with motorists.

Thanks to Supervisor Hyland and Delegate Surovell for supporting the project and to Fairfax County and VDOT staff for their work on the project. The newly configured road will benefit all users by making it safer and providing a dedicated bike facility.

Back to School in Fairfax

Fairfax County Schools resumed classes on Tuesday, September 2. Drivers who have been commuting past empty schools all summer will face a plethora of walkers/bikers/buses and additional cars on their normal commute. The best advice to drivers is to simply slow down and enjoy watching all the kids make their way to school for another year of learning.  Students and parents also need to be reminded to be safe. If walking, cross at intersections and look both ways before crossing. If riding, wear a helmet, ride with traffic and signal your intentions. Some advice from our Police Department: Back to School Safety Reminders.

We hope this year in FCPS will show a marked increase in schools participating in Safe Routes to School (SRTS) Programs.  Some dates to remember:  September 15-19 is VDOT's Student Tally Week, October 8 is International Walk to School Day and October 28 is the Greater Washington DC SRTS Regional meeting. The National SRTS Partnership is also looking for feedback about the types of services and support you need in your work to advance Safe Routes to School. Please take the SRTS Survey. Lastly, here is a good article from our UK brethren: Pedal Power: Why Cycling to School is Good for Learning and the Planet. And here is a nice school-related graphic from our friends in Arlington.



Bicyclists Flocking to Wiehle-Reston East Station

FABB has been doing midday counts of bikes parked at the Wiehle-Reston East Metro station since the station opened. There are 10 U racks at the south station entrance, with a capacity of 20 bikes. On the north side there are 16 U racks outside the bike room that hold 32 bikes. There is no charge to park at those racks located under cover. The secure bike room can hold over 200 bikes.

Below is a chart of counts from July 31 to August 28. Over time the number of bikes has gradually increased from a low of 61 on the second count to a high on August 28 of 107. If you compare the high number with the 2013 Metrorail bike parking census conducted by WMATA, the Wiehle station would rank 3rd in the category "Top Stations for Total Bikes Parked".

The free racks outside the bike room were over capacity (bikes locked to the fencing) 6 of the 10 days. An average of 13 bikes (of 20 capacity) were parked at the south racks, so there was usually a place to park. The bike room was at about 1/4 capacity with plenty of room for more bikes for those who pay the $60 annual fee (approximately 25 cents/day for daily commuters).

Upcoming Events

Labels: , , , ,

(0) comments
Monday, August 18, 2014
 

Sherwood Hall Lane bike lanes installed

VDOT is completing the installation of bike lanes on Sherwood Hall Lane as part of a repaving/pavement marking project to improve safety. See an earlier FABB blog post for details. We've already heard from cyclists in that area who welcome the new bike lanes. Thanks to Supervisor Hyland and Delegate Surovell for supporting the project and to Fairfax County and VDOT staff for their work on the project. The newly configured road will benefit all users by making it safer and providing a dedicated bike facility. Please send thank you notes to Supervisor Hyland and Del. Surovell.

Del. Surovell is a cyclist. Here are his comments on the project along with a video clip he recorded on a recent bike ride along Sherwood Hall Lane, posted on his blog, The Dixie Pig:
Multimodal improvements are critical to get more cars off the road. It is also hoped that by restricting lane size, this will help to lower speeds and illegal passing on Sherwood Hall Lane which has become a real problem with increased cut through traffic.

These improvements were the result of two public hearings and significant public input. These lanes will eventually link into to a multiuse path on U.S. 1 and other bike lanes as U.S. 1 is redone, properties are redeveloped and road repaved.

Labels: , ,

(0) comments
Thursday, April 17, 2014
 

Bike lanes will be included in Sherwood Hall Lane project

Profiles from original plan. See segment
map and other profiles
.
In a memo to local officials, Fairfax County DOT announced that the Sherwood Hall Lane Pavement Marking project will include bike lanes from Route 1 to Fort Hunt Road. Thanks to all the cyclists who took the time to comment on the project and thanks to WABA for helping to get the word out.

Unfortunately the little-used on-street parking is also included. The bike lanes "will be carved from the existing parking lane." Without seeing the final pavement marking plan it's difficult to determine whether or not the bikes lane will be located in the "door zone" but it seems likely.

While we're encouraged to see that bike lanes are included in the plan, we think this is a missed opportunity to provide a more safe street for motorists and bicyclists. Not only will the on-street parking be retained, but the two way left-turn lane will be removed in Segments 4-6 which means motorists will likely use the bike lane as a passing lane when traffic is turning left.

See our earlier post that includes the segment map and profiles. After some searching I could not find information about the project on the county website.

We hope to review the final pavement marking plan when after it is presented to VDOT on April 25.

Below is a version of the memo:
DATE: April 14, 2014

TO: Supervisor Gerald Hyland, Delegate Scott Surovell, and Senator Toddy Puller

FROM: Seyed A. Nabavi, Engineer III, Department of Transportation

SUBJECT: Update on Sherwood Hall Lane Pavement Marking

This memorandum is an update on the Sherwood Hall Lane Pavement Marking project. We have received seventy seven comments via mail, email, and comments provided at the public information meeting before March 26th. We also received six comments after the March 26th deadline.

The comments have been compiled and they are mainly focused on retaining on‐street parking and providing bike lanes. The overwhelming desire of the residents in the eastern portion of Sherwood Hall Lane is to retaintheiron-streetparking. We understand that this space provides benefits beyond merely vehicle storage, such ascreating a buffer between the curb and fast‐moving traffic, and providing a safe place to walk where sidewalks do not exist.

We are pleased to report that we have modified the pavement marking plan to retain all the on‐street parking between Parkers and Fort Hunt by eliminating the proposed left-turn lanes. A bike lane will be carved from the existing parking lane, but this space will continue to contribute to the buffer space valued by the residents. Generally, we will provide the following design for the six segments on the project:

Segment 1 Route 1 to FordsonRoad:

The proposed design on this segment will remain the same. We will look at the queue length of the east bound right turns and provide enough gap in bike lanes for the right turning vehicles.

Segment 2 Fordson Road to Schelhorn Road:

The proposed design on this segment will remain the same. We will look at the queue length of the west bound right turns and provide enough gap in bike lanes for the right turning vehicles.

Segment 3 Schelhorn Road to Frances Drive:

The proposed left turn lane into the library will be preserved. The proposed left turn lane into Frances Drive will be removed and the existing parking will be retained on the south side of Sherwood Hall Lane (in front of the library).

Segment 4 Frances Drive To Davenport St:

The proposed two way left turn lane will be removed. The existing parking will be retained on both sides of Sherwood Hall Lane and the bike lanes will be striped.

Segment 5 Davenport Street To Kirkside Drive:

The proposed two way left turn lane will be removed. We will provide a new eastbound left turn lane into Kirkside Drive. The existing parking will be retained. The rest of the proposed design remains the same.

Segment 6 Kirkside Drive to Fort Hunt Road:

We will implement typical section concept 2 on this segment. The proposed two way left turn lane will be removed and the bike lanes will be striped. The existing parking will be retained.

We are in the process of finalizing the pavement marking and signage plans. Virginia Department of Transportation (VDOT) is in the process of repaving areas near Sherwood Hall  Lane, We will submit the final plans to VDOT on April 25th for their review and implementation.

If you have any questions or would like additional information, please email me at Seved.Nabavi@fairfaxcountv.gov or call me at (703) 877‐5759.

Labels: , ,

(0) comments
Tuesday, March 25, 2014
 

Support bike facilities on Sherwood Hall lane

Share the Road sign on Sherwood Hall Lane.
Photo taken on FABB South County tour in 2007
Sherwood Hall Lane is scheduled to be repaved from US Route 1 to Fort Hunt Road. VDOT and Fairfax Co DOT have proposed adding bike lanes, a center turn lane, and removing some of the little-used on-street parking, in order to calm traffic. Several local residents are opposing the plan for bike lanes and removal of parking. Please visit the WABA Sherwood Hall Lane alert page to send a message to Supervisor Hyland, and if you are a constituent, to Senator Puller and Delegate Surovell.

Making Sherwood Hall Lane a more complete street will benefit all users of the road. By reducing the travel lane width, adding a center turn lane, and adding bike lanes, the road will be safer for everyone, including local residents. Residents are opposed to the plan, primarily because of the loss of the parking. A great deal of space is devoted to free parking that very few people use. The same arguments for opposing the bike lanes and retaining on-street parking that were used to oppose the King St. bike plan are being used to oppose the Sherwood Hall Lane plan. Many, many people use this road who do not live in the immediate area and they should to weigh in on this decision.

Labels: , , ,

(0) comments
 

Sherwood Hall Lane repaving - Proposed cross sections

Below are proposed cross sections for 6 segments of the Sherwood Hall Lane repaving project that was the subject of a meeting on Wed., March 12. The major concern expressed at the community meeting was removal of parking. As you can see below, some of the proposed profiles, do not include parking. Even though very few motorists park on the road, residents want the option of parking for guests and overflow from their driveways. Please contact the Mt. Vernon District office, Senator Toddy Puller, and Delegate Scott Surovell and voice your support for bike lanes and traffic calming on Sherwood Hall Lane.




Labels: , , ,

(0) comments
Tuesday, March 11, 2014
 

Sherwood Hall Lane repaving meeting tomorrow

The meeting to discuss proposed bike lanes on Sherwood Hall Lane is tomorrow, Wed., March 12. Cyclists are encouraged to attend the meeting and to learn more about the project and to support the inclusion of bike facilities in the plan. There is opposition to the plan so your support is important. The meeting is from 6:30-8:30 p.m. at Mount Vernon Governmental Center, 2511 Parkers Lane, Alexandria, VA 22306.



Labels:

(0) comments
Saturday, March 1, 2014
 

March-April 2014 FABB Newsletter

MARCH-APRIL 2014 FABB News
A bi-monthly publication of Fairfax Advocates for Better Bicycling
www.fabb-bikes.org

Bicycle Master Plan Public Hearings Scheduled

ffxcobmpThe Fairfax Co Bicycle Program Manager recently announced dates for public hearings on the Countywide Bicycle Master Plan. The Planning Commission hearing is scheduled for Thursday, May 8 in the evening, and the Board of Supervisors hearing is scheduled for Tuesday, June 17. Both hearings will be held at the Fairfax County Government Center. This is a great opportunity for you to show your support for better bicycling in the county, either by attending a public hearing or writing a letter of support to your county Supervisor.

FABB plans to hold rides to the public hearings. Having a number of cyclists present at the hearings shows we care about our community and that we want the Board to approve the plan. The plan is not yet available on the county website but FABB has posted the July 2012 Draft Bicycle Master Plan text and maps (see FABB homepage for map links).

Wiehle Station Bike Room Applications Being Taken

0038~©DavidMadisonPhotography.comFairfax County DOT recently sent out applications to over 130 cyclists who requested information about renting a space in the new Wiehle-Reston East Metro station bike room. The room has capacity for over 200 bikes. Rates for use of the bike room are $40 for six months or $60 for a year plus a one-time $15 fee for a key fob. See the Wiehle Bike Room page for details and to request an information packet or see the FABB blog for other details, including the bike room FAQ.

Fairfax County Parkway Trail Repair to Begin in March

VDOT recently held an information meeting on the Fairfax County Parkway Trail repair project scheduled to begin this month. The first phase of the project will extend from Route 7 to Route 29, although the section around the I-66 overpass will not be included. Only the most damaged sections of the trail will be repaved. Where large cracks have developed but the remainder of the trail is in good condition, the cracks will be sealed. Where the asphalt has deteriorated, those sections will be repaved.

The section of trail being repaired will be closed between 9 a.m. and 3 p.m. Cyclists using the trail for commuting during regular business hours should be able to complete their trips before and after those times. Otherwise we've asked that where possible, trail users be allowed to carefully bypass work in progress. Informational signage and maps will be posted on site. See the FABB blog for more info about the meeting. The work is a major undertaking and will greatly benefit cyclists who use this important north-south trail connection. Thanks to VDOT for funding the work and listening to our concerns. Their efforts are very much appreciated.

Fairfax County Board Approves Funding for New Bike Projects

The Fairfax County Board of Supervisors recently approved over $200 million in funding for pedestrian and bicycle projects as part of a major 6-year transportation funding package. The majority of the projects are pedestrian sidewalks. Bicycle project funding was not identified separately. We've estimated that approximately $40 million is available for bike projects, approximately $7 million/year. This is a significant increase in funding from previous years although it is only a small portion (3%) of the nearly $1.3 billion in total transportation funding. Bike projects will be included in many of the road projects that were part of the package. Funds for improving bike access to the Silver Line stations are also available. Unfortunately none of these funds can be used for maintenance.

Meeting to Discuss Bike Lanes on Sherwood Hall Lane

On Wednesday, March 12 Fairfax DOT and VDOT are holding a meeting to discuss proposed bike lanes on Sherwood Hall Lane. This road is an important connection between Mt Vernon Parkway/Fort Hunt Rd and the Route 1 Corridor. Some nearby residents have voiced strong opposition to the plan. Cyclists are encouraged to attend the meeting and support the proposal. The meeting is from 6:30-8:30 p.m. at Mount Vernon Governmental Center, 2511 Parkers Lane, Alexandria, VA 22306. See the meeting announcement for more details.

Fairfax County to hold Sidewalk Snow Removal Forum

At the Fairfax Co Board of Supervisors meeting on February 25 Hunter Mill District Supervisor Hudgins raised the issue of snow removal on sidewalks. She asked the Board to direct staff to hold a "forum for discussion of sidewalk snow removal." The Board has addressed this issue repeatedly in the past as we outlined in a recent blog post on snow-covered sidewalks and trails. We will suggest that snow removal on trails and bike lanes be included in the discussion. See the FABB blog for more info on Supervisor Hudgins' request. When a date for the forum is announced we'll spread the word via FABB social media.

Upcoming Events


Labels: , , , ,

(0) comments
Thursday, February 27, 2014
 

Meeting to Discuss Bike Lanes on Sherwood Hall Lane

On Wednesday, March 12 Fairfax DOT and VDOT are holding a meeting to discuss proposed bike lanes on Sherwood Hall Lane. This road is an important connection between Mt Vernon Parkway/Fort Hunt Rd and the Route 1 Corridor. Some nearby residents have voiced strong opposition to the plan. Cyclists are encouraged to attend the meeting and support the proposal. The meeting is from 6:30-8:30 p.m. at Mount Vernon Governmental Center, 2511 Parkers Lane, Alexandria, VA 22306.

From the meeting announcement: This coming year Sherwood Hall Lane is scheduled to be repaved from US Route 1 (Richmond Highway) to Fort Hunt Road (State Route 629). VDOT and Fairfax Co DOT are examining changes in the pavement markings and signage to address the community’s concerns and make Sherwood Hall Lane more pedestrian and bicycle friendly. As part of the County’s on road bike lane initiative, funding has been made available to prepare pavement marking plans in order to retrofit bike lanes and left turn lanes as part of this repaving project. An initial concept of the markings is to be presented at this public information meeting. The public is invited to comment on the concept.

Labels: ,

(0) comments
Contact FABB via email: info@fabb-bikes.org

Subscribe to the
FABB e-newsletter


Subscribe to posts:
[Atom 1.0] or [RSS 2.0]





  Bike to Work Day 2015 at Wiehle Station

  Transportation choices

This page is powered by Blogger. Isn't yours?

Archives