Wednesday, November 19, 2014
 

WABA Publishes Arlington Blvd/Route 50 Trail Concept Plan

Yesterday WABA released a plan for creation of a connected bike trail along Route 50 from Arlington to Fairfax City, the Arlington Boulevard Trail Concept Plan. Bike facilities on Route 50 are a high priority for FABB and WABA. Thanks to WABA for putting together this plan. Now the local jurisdictions, working with VDOT, have concrete guidance for building of this trail.

From the Executive Summary:
Arlington Boulevard runs just over twelve miles from the National Mall in Washington, DC to Fairfax City, VA, crossing several jurisdictional lines and the Potomac River along the way. The thoroughfare connects over 110,000 people living in the adjacent neighborhoods to offices, retail, parks, schools, and government services. But it lacks a consistent, high-quality bicycling route.

Such a route would encourage bicycling and walking along its length, increase the value of existing bicycle and pedestrian facilities by making them part of a more connected network, and improve the character of the corridor for all users. The Virginia Department of Transportation (VDOT) and the Metropolitan Washington Council of Governments (MWCOG) have identified this route as an import-ant, yet underdeveloped, bicycle route in several planning documents--but to date, improvements have been piecemeal. This document shows how those piecemeal improvements could combine to form a functional trail for transportation and recreation.

Labels: , ,

(0) comments
Thursday, June 13, 2013
 

Bike facilities on Route 50: Beltway to Arlington

On Tuesday three of us took a brief tour of bike facilities along the south side of Route 50 from Providence District Park just inside the Beltway to Fort Meyer where Route 50 makes a sharp turn north in Arlington. The Route 50 corridor is a major commuter route. The road is located in the center of the county and leads from the suburbs into the city. What would it take to create a first class bike facility along Route 50 along the lines of the recently created "cycle superhighways" in Copenhagen?


The Beltway/Route 50 interchange is a major barrier for bicycle travel in Fairfax. At the interchange Route 50 contains 4 lanes in each direction with high speed exit and entrance ramps to the Beltway.
The speed limit is 45 mph which most motorists exceed; it's very similar to an interstate highway interchange. Few cyclists dare ride through the interchange. Just east of this intersection is the massively over-built Fairview Park interchange that also contains high speed exit/entrance ramps.

Route 50 at I-495/Beltway
With relatively high density development on each side of the Beltway, there's a pressing need for pedestrian and bicycle accommodations connecting the two areas. The Lee Highway and Gallows Road Beltway crossings to the north and south now have bike facilities, but they are both located nearly 3/4 of a mile away.

We left the rec center and entered Route 50 at Jaguar Dr adjacent to Falls Church High School. We followed a narrow sidewalk along 50 to reach the first segment of service road to the east. Service roads are the best option for traveling by bike along Route 50 in this area.

Closed service road at
Annandale Road
Bike conditions on the service roads are good, with low volume, low speed traffic. The biggest danger is motorists entering the service drive from Route 50.

We continued on the service road to the Graham Road intersection, which in the past has been one of the most dangerous locations for pedestrians in the county.

Just east of Graham Road the service road turns into Woodley Lane that we followed back to the service road. Just before the Annandale Road intersection the service road is closed with no accommodations for bicyclists or pedestrians. A lane is being added, the median was shifted, and it looks like the service is going away which is
bad news for bicyclists. The same thing happened in Tysons on Route 7 and bike conditions there are worse now than before the recent road construction.

The other side of the intersection was also under construction. You can see from the second photo that orange cones and barrels are blocking the curb ramp and there are no accommodations for pedestrians or bicyclists.

We continued east toward Seven Corners on the service road. The service road turns into a ramp leading uphill toward Route 7, then back down toward Route 50. Just before Route 7 we jogged over to Castle Road, crossed Route 7 and rode through the new transit center near the pedestrian bridge over Route 50. On Castle Road we discovered one of the rare Fairfax County Bike Route signs.

Castle Rd/Rt 7 at Seven Corners
Note bike route sign on the right
The service road continues beyond Seven Corners although it becomes one-way in a couple of places where a contra-flow bike lane is needed. The service road disappears where Route 50 crosses the W&OD and Four Mile Run trails. It then continues beyond the Four Mile Run bridge until just before Glebe Road.

At Glebe Road we encountered one of the worst sections of the route, a narrow stretch of unmaintained sidewalk immediately adjacent to the Glebe Rd exit ramp. Another cyclist was riding in the opposite direction so we bailed out to let him pass. This section needs to be fixed soon. The sidewalk should be expanded into a paved trail, with better separation from adjacent traffic.

We followed the paved trail just east of Glebe Rd and continued to our turnaround point at S. Washington Blvd and Arlington National Cemetery.

Sidewalk just west of
Glebe Road
The long term vision is to have a first class bicycle facility along Route 50 from Arlington Cemetery to Loudoun County. VDOT conducted a study of bike facilities in Northern Virginia in 2003, the Northern Virginia Regional Bikeway and Trail Network Study. Included were recommendations for  improving bike access along two sections of Route 50/Arlington Blvd; from Fairfax City to Arlington County, and a short stretch from Park Drive to Glebe Road in Arlington.

According to the NoVa Bikeway study, "Arlington Boulevard is recommended as a key regional commuter route. As such, bicycle facilities along Arlington Boulevard should provide a high quality, direct, and safe connection for bicycle users – in effect, serving as a principal arterial for bicycle travel. As such, improvements along this corridor should provide a coherent and clear path of travel for bicyclists, using a combination of trails, pathways, and service roads."

The NoVa Bikeway study does not go into detail regarding needed improvements. Instead it suggests that a new study be undertaken to determine specific recommendations. We hope to work with our colleagues in Arlington County to begin to address the need for better bike facilities along Route 50 by advocating that VDOT conduct a detailed study of the corridor to determine the best solution for bike access. Is it possible to create a cycling superhighway parallel to  Route 50? How much would it cost? We'd like to know.

Labels: , ,

(3) comments
Saturday, March 23, 2013
 

Fairfax Co Parkway trail still unpaved

FFX Co Parkway Trail
looking south from Route 50
We heard recently that the section of Fairfax County Parkway Trail that had been closed for many months, between Route 50 and Monument Dr, was finally paved. Our source had only driven by the trail so we decided to ride there today to check it out. We also wanted to take our recumbent tandem for a spin since we haven't used it in a while.

We've written about this section of trail too many times. When we last wrote about it, nearly a month ago, VDOT had just opened it for use. It wasn't paved but at least it was open. It appeared that it would be paved any day. Well, almost no progress has been made. A long section of the trail is still unpaved.

Parkway Trail at Route 50
As you can see from the first photo, there's construction debris blowing across the trail and just beyond that is a wide eroded area. Just north of here (left photo) the trail is a mess, with trash scattered about and construction fences still up. Construction is still ongoing so we'll be pleased once the project is finally completed.

Closer to Monument Dr the trail has been paved. It's a nice, wide surface that extends down to Monument Dr.

It's unfortunate that it has taken so long to finish this trail segment. The road has been paved and open to traffic since November 2012.

Paved an unpaved sections
of the trail
We've scheduled a meeting with VDOT's Assistant District Administrator on April 9 April 10 to discuss the trail closure and how to keep it from happening on this and other trails in the future.

After checking out the trail we rode to lunch, stopped by REI to drop off some FABB rack cards, then tried to leave two used smoke alarms at the county landfill. It might have been the first time the folks at the landfill had seen customers on a recumbent tandem. They said not to worry, that we should just put the smoke alarms, that have radioactive sensors, in the trash.


Bikes parked in rack
in front of REI Fairfax Corner
It turned out to be a nice day. Unlike on the W&OD Trail, we encountered few cyclists. Running errands by bike is an easy way to get some exercise, discover new bike routes in the county, and save on gas.

Labels: , ,

(0) comments
Tuesday, February 24, 2009
 

VDOT public hearing on Route 50 widening this Thursday

VDOT plans to widen Route 50 from just west of Route 28 to Route 742 (Poland Road) in Loudoun County. The project plans include 10-foot multi-use trails on each side but no on-road facilities. FABB has reviewed the plans and will testify at the hearing. The hearing will be held on Thursday, February 26 from 6:00 p.m. and 9:00 p.m. at the VDOT Northern Virginia District Office, 14685 Avion Parkway, Chantilly, Va. 20151. The office is located adjacent to the planned project.

Labels: ,

(0) comments
Contact FABB via email: info@fabb-bikes.org

Subscribe to the
FABB e-newsletter


Subscribe to posts:
[Atom 1.0] or [RSS 2.0]





  Bike to Work Day 2015 at Wiehle Station

  Transportation choices

This page is powered by Blogger. Isn't yours?

Archives