Tuesday, May 27, 2014
 

Article criticizing Fairfax Co bike funding gets facts wrong - Update

I hesitate to give publicity to such a poorly written article on funding of pedestrian and bike projects in Fairfax County, but such a biased, one-sided article requires a response. Kenric Ward, a writer for Examiner.com and watchdog.org, recently wrote a misinformed and very negative article about Fairfax County's decision to fund most ped/bike projects using a transportation bond this Fall: Fairfax wants millions more to push bikes, pedestrians

According to Ward, "A proposed $100 million transit referendum earmarks $85 million for new bikeways and pedestrian paths. The outlays come on top of more than $200 million in bike-ped projects already approved."

For one, the referendum is for funding "transportation" projects, not "transit" projects. The $85 million is mostly for sidewalk projects that are part of a total of $200 million for sidewalks, trails and a very few on-road bike projects, NOT "on top of more than $200 million in bike-ped projects."

Most of the projects under consideration are sidewalk retrofits in neighborhoods that were built without them. There are very few bike projects being funded. The funding for one interchange on Fairfax County Parkway alone is costing $90 million (the first three road projects listed will cost nearly $350 million). The actual bike funding is a pittance compared to the $1.4 billion total of mostly road and transit projects.

The first quote sets the tone for the rest of the article:
This doesn’t make any more sense than a $1 million bus stop,” Supervisor Pet Herrity said
Springfield District Supervisor Herrity has made a habit of criticizing bike projects and calling for the elimination of the bicycle coordinator position. He's the only supervisor quoted in the article.

Ward makes an offhand reference to a bridge over the Toll Rd that is only 59 feet wide with 35 feet devoted to bikes and peds. Does he make this stuff up? That would be a bridge with two 12-foot travel lanes, two 10 foot trails, and bike lanes on each side of the road that are 7.5 feet wide:
 One of the more controversial pieces isn’t even in the $85 million package. A $92 million overpass spanning the Dulles Toll Road reserves more than 35 feet of the 59-foot-wide bridge for bicyclists and pedestrians.
As TheWashCycle points out, maybe he's referring to the Soapstone Connector in Reston that will have bike lanes and sidewalks. Even so, the bridge is 99.5' wide. There are four 12-foot travel lanes taking up 48 feet of right of way. Bike lanes and sidewalks make up 25 feet of right of way.

In other words, in the first four paragraphs there appear to be at least 3 blatant errors of fact.

Ward spoke to someone from Potomac Pedalers Touring Club and managed to extract two negative quoits about bike lanes and sharrows. I'm quoted in the article but no attempts were made to contact me.

Ward is the same reporter who wrote a very anti-bike article about Arlington's attempts to become more bike-friendly, Arlington peddles bikes at expense of cars, taxpayers.

See our earlier posts about the 2014 transportation bond.

Update: Fairfax Co recently posted a list of projects to be included in the 2014 Transportation  Bond.

Labels: , ,

(3) comments
Contact FABB via email: info@fabb-bikes.org

Subscribe to the
FABB e-newsletter


Subscribe to posts:
[Atom 1.0] or [RSS 2.0]





  Bike to Work Day 2015 at Wiehle Station

  Transportation choices

This page is powered by Blogger. Isn't yours?

Archives